Ordered that the order is affirmed, with one bill of costs to the plaintiffs-respondents.
The data control center of the injured plaintiff's workplace was being updated by the defendant Healy Electric Contracting, Inc. (hereinafter Healy), and the third-party defendant, Bellway Electrical (hereinafter Bellway), with fiber optic and copper cables placed in channels under the floor. The floor was covered with 18-inch square tiles approximately 15 inches above the subfloor...