Ordered that the order is affirmed, with costs.
On the morning of March 6, 2007, in Chappaqua, the plaintiff, a carpenter, was nailing a plywood board to the floor joists of the first floor of a residence under construction. He was working less than four feet from the unprotected edge of the first floor, which was approximately 10 to 15 feet above a dirt floor. A stack of plywood boards, each eight feet by four feet by three-fourths inch in size, was placed nearby...