OPINION
INTRODUCTION
Preserve Wild Santee, Center for Biological Diversity, and Endangered Habitats League, Inc. (collectively, plaintiffs), challenged the certification by the City of Santee (City) of a final environmental impact report (EIR) for a development project in the City's Fanita Ranch area (project), claiming the project failed to comply with the California Environmental Quality Act (CEQA) (Pub. Resources Code, § 21000 et seq.) in several respects.
On appeal, plaintiffs reassert several claims raised below, including that the EIR improperly deferred mitigation of the project's impacts on the Quino checkerspot butterfly (Quino) and inadequately analyzed the project's water supply impacts. They also contend the trial court was not permitted to issue the limited writ and, instead, was required to vacate the City's certification of the EIR and all related project approvals.
The City and real party in interest HomeFed Fanita Rancho, LLC (HomeFed or developer),
We conclude the EIR improperly deferred some of the mitigation for the project's Quino impacts and inadequately analyzed the project's water supply impacts. Although we conclude the trial court may, in appropriate cases, remedy CEQA violations by issuing a limited writ, we question whether this was an appropriate case since the flaw in the EIR's fire safety impacts analysis affected the entire project and the project's fire safety impacts interrelate with its impacts on biological resources, such as the Quino and grasshopper sparrow, requiring careful vegetation management for their preservation. We need not decide the matter, however, since the trial court has
BACKGROUND
Environmental Setting
The project covers 2,600 acres of undeveloped land in Santee, north of State Route 52 and west of State Route 67. The land contains several different biological communities "including wetland (e.g., seasonal basins and freshwater marsh), riparian (e.g., southern willow scrub, coast live oak riparian woodland, sycamore woodland, mule fat scrub), southern mixed chaparral, coastal sage scrub, disturbed coastal sage scrub, grasslands, disturbed or graded areas, and rock outcroppings."
The project would develop approximately 970 acres of the land into 1,380 single-family dwelling units and approximately 230 acres into a pedestrian-oriented village center with 15 live/work units as well as community-serving recreational resources, including a 10-acre lake. The remaining approximately 1,400 acres of land would become an open space preserve (preserve).
In certifying the EIR, the City found the project would result in significant unavoidable air quality, traffic circulation, and cumulative climate change impacts. It adopted a statement of overriding considerations concluding the project's benefits outweighed these adverse impacts. The City found the project's other environmental impacts to be either less than significant or mitigated to a level of less than significant.
This appeal involves the project's impacts to fire safety, certain biological resources, and water supply. We, therefore, confine our summary to these areas.
Fire Safety Impacts6
The project is located in a declared high fire hazard zone due to the vegetation type, fire history, and rough topography in the area. The project
To address the project's fire safety risks, the developer prepared a fire protection plan (fire plan) for the project. The fire plan's objective was to ensure the project's structures could survive wildfires without structure loss, without loss of life, and without intervention from firefighting personnel, who may be unavailable during a wildfire due to a high demand for their services.
To achieve its objective, the fire plan relied on multiple strategies, including: (1) building structures with fire-resistant materials and sprinklers; (2) creating and maintaining "firewise" landscaping zones around structures; and (3) managing the amount of potential fuel in open space areas with prescribed burns or goat grazing. The EIR concluded the project's fire safety impacts were less than significant chiefly because of the fire plan.
However, when the City approved the project, it did not adopt the open space fuel management portion of the fire plan. Because the EIR's fire safety analysis depended entirely on the City's implementation of the fire plan and the fire plan depended in key part on periodic open space fuel modification with either prescribed burns or goat grazing, the trial court concluded there was insufficient evidence to support the EIR's conclusion the project did not have significant fire safety impacts.
Biological Resources Impacts
Analysis of Cumulative Impacts
The Multiple Species Conservation Program (MSCP) covers 900 square miles in San Diego County, including the project site and surrounding property. Participants in the MSCP include the City, the City of San Diego, the County of San Diego, and nine other local jurisdictions. Each jurisdiction implements its portion of the MSCP by developing a subarea plan describing the jurisdiction's specific implementing mechanisms, preserve boundaries, and species and habitats protections consistent with the MSCP framework plan.
Once adopted by the jurisdiction and approved by the U.S. Department of Fish and Wildlife and California's Department of Fish and Game (wildlife agencies), the subarea plan in conjunction with the MSCP operates as a habitat conservation plan consistent with the federal Endangered Species Act of 1973 (16 U.S.C. § 1531 et seq.) and a natural community program
At the time the City certified the EIR, the City of San Diego and the County of San Diego had approved subarea plans. The City had drafted, but had not adopted, its subarea plan. The draft subarea plan covers 15 plants and 33 wildlife species. Relying on a combination of hard-line protection areas and soft-line criteria-based protection zones, it estimates the location of future development and habitat preservation, and summarizes the mitigation and management requirements necessary for consistency with the MSCP.
The draft subarea plan is divided into five subunits: the San Diego River subunit, the Rattlesnake Mountain subunit, the Mission Trails subunit, the Magnolia Summit subunit, and the Fanita Ranch subunit. The project site is located in the Fanita Ranch subunit.
In assessing the project's cumulative impacts to biological resources, the EIR noted most of the surrounding property south of the project site is completely developed. There were no projects proposed for the surrounding property south and east of the project site, which had limited development potential as it was included in the City's draft subarea plan conservation planning. As to surrounding property within the County of San Diego's jurisdiction, there was no anticipated development on property north of the project, but property northeast of the project could be developed. Finally, as to surrounding property within the City of San Diego's jurisdiction, there were proposals to develop property southwest of the project and expand a landfill west of the project.
Because both the City of San Diego and the County of San Diego have approved subarea plans, the EIR assumed any projects approved within these jurisdictions would be consistent with their subarea plans and, by implication, the MSCP. Although the City did not have an approved subarea plan, it had committed through its general plan to applying the MSCP conservation standards and the draft subarea plan to projects within its jurisdiction. Consequently, the EIR assumed any projects approved within the City's jurisdiction would be consistent with either the City's draft subarea plan, if adopted, or the MSCP's guiding principles, which are uniform throughout the MSCP area. Based on these assumptions, the EIR concluded the project's
Mitigation of Quino Impacts by Active Management of Species Within Preserve
The Quino is classified as an endangered species. It requires large, unfragmented areas of habitat generally consisting of "open scrub vegetation with larval host plants, nectar sites, and small to large topographic rises in close proximity." Among its significant impacts to biological resources, the project is expected to directly impact approximately 991.1 acres of potential Quino habitat. To mitigate this impact, the EIR specifies the developer must preserve 1,235.2 acres of onsite habitat suitable for the Quino and must install fencing along certain trails, which will deter access to an area in the preserve where a Quino was once sighted. In addition, the developer must acquire approximately 110 acres of offsite mitigation property that either supports the Quino or is proven to have a high potential to support the Quino.
The preserve will be protected by a conservation easement and managed in perpetuity by a habitat management plan (habitat plan) approved by the City and the wildlife agencies. At a minimum, the habitat plan must be a long-term plan for management of the preserve property "that accomplishes the goal of maintaining appropriate, high-value, native plant communities." It must include the location of offsite mitigation property, the language of the conservation easement, the plan for long-term preserve management, the responsibilities of the preserve manager, and the funding mechanism for the preserve. In addition, it must "address management and monitoring of vegetation communities through specific minimum survey and management requirements." It must also "discuss appropriate fencing or other barriers to protect certain sensitive resources," "designate and describe all permitted land uses and activities" within the preserve and "how impacts to preserve vegetation communities will be avoided," "include management measures for five [specified] sensitive plant species ... to maximize the likelihood of their long-term viability," and include a Quino management section providing for active management of the Quino within the preserve.
To show the intended management program for the preserve, the City circulated a draft habitat plan. The draft habitat plan incorporated the draft EIR's requirements for it, and described the responsibilities of the preserve
Related to the Quino, the anticipated management activities included nonspecific actions to promote Quino habitat on slopes within the preserve where host and nectar plants are present at significant densities. The anticipated management activities for the Quino additionally included using host and nectar plants along with the creation of thermoregulation sites at a proposed seasonal basin mitigation site. Although the developer agreed to fund the Quino-related management activities, the draft habitat plan indicated the timing and other specifics for undertaking the activities would be subject to the discretion of the preserve manager based on prevailing environmental conditions.
The draft habitat plan also lists the special status species known to occur or that have the potential to occur within the preserve and relevant information about each species, including special management considerations. For the Quino, whose primary habitat is sparsely vegetated hilltops, ridgelines, and rocky outcrops, the draft habitat plan states the key consideration is proper vegetation management. According to the draft habitat plan, periodic fire or other vegetation management, such as grazing, is needed to keep the habitat open, but cannot occur too frequently or it will impact larvae and/or promote exotic, invasive species. The draft habitat plan does not discuss how the vegetation will be managed given the City's decision not to permit prescribed burns or grazing in the open space area.
Subsequent to the release of the draft habitat plan, the developer prepared a report "discussing monitoring and management actions to actively conserve Quino on-site." After an initial review of this report, the wildlife agencies were not convinced the proposed actions were sufficient and indicated the developer needed to revisit them. The wildlife agencies' concerns prompted the EIR's requirement for the inclusion of the Quino management section in the approved habitat plan.
Acquisition of Offsite Mitigation Property
As part of the mitigation for the project's biological resources impacts, the EIR requires the developer to acquire 209.6 acres of offsite habitat directly contributing to regional conservation efforts. The mitigation property must consist predominantly of coastal sage scrub, but may include some chaparral and grassland habitats. Approximately 100 acres of the mitigation property must be adjacent to the project site within the north Magnolia Summit subunit of the City's draft subarea plan. As discussed ante, the remaining property must either support the Quino or be proven to have a high potential to support the Quino. It must also, if feasible, be in a contiguous block. Acquisition of the mitigation property is subject to the approval of the City, and the developer must option or secure the property before the developer can obtain a mass grading permit.
Water Supply Impacts
The EIR estimates the project's water demand to be 1,290,700 gallons per day, or approximately 1,446 acre-feet per year. The project is in the service area of Padre Dam Municipal Water District (district). The district gets its water from the San Diego County Water Authority (water authority), the water authority gets most of its water from the Metropolitan Water District of Southern California (Metropolitan), and Metropolitan gets its water primarily from the State Water Project and from the Colorado River Aqueduct, which Metropolitan owns and operates.
In April 2006 the district prepared a water supply assessment and verification report (assessment) for the project.
DISCUSSION
I
Standard of Review
"`"Under CEQA, an EIR is presumed adequate (Pub. Resources Code, § 21167.3), and the plaintiff in a CEQA action has the burden of proving otherwise."'" (Concerned Citizens of South Central L.A. v. Los Angeles Unified School Dist. (1994) 24 Cal.App.4th 826, 836 [29 Cal.Rptr.2d 492].) In CEQA cases, as in other mandamus cases, "we independently review the administrative record under the same standard of review that governs the trial court." (Federation of Hillside & Canyon Associations v. City of Los Angeles (2000) 83 Cal.App.4th 1252, 1259 [100 Cal.Rptr.2d 301]; accord, Vineyard Area Citizens for Responsible Growth, Inc. v. City of Rancho Cordova (2007) 40 Cal.4th 412, 427 [53 Cal.Rptr.3d 821, 150 P.3d 709] (Vineyard).) We review an agency's determinations and decisions for abuse of discretion. An agency abuses its discretion when it fails to proceed in a manner required by law or there is not substantial evidence to support its determination or decision. (§§ 21168, 21168.5; Vineyard, supra, 40 Cal.4th at pp. 426-427.) "Judicial review of these two types of error differs significantly: While we determine de novo whether the agency has employed the correct procedures, `scrupulously enforc[ing] all legislatively mandated CEQA requirements' [citation], we accord greater deference to the agency's substantive factual conclusions." (Vineyard, at p. 435.)
Consequently, in reviewing an EIR for CEQA compliance, we adjust our "scrutiny to the nature of the alleged defect, depending on whether the claim is predominantly one of improper procedure or a dispute over the facts." (Vineyard, supra, 40 Cal.4th at p. 435.) For example, where a petitioner claims an agency failed to include required information in its environmental analysis, our task is to determine whether the agency failed to proceed in the manner prescribed by CEQA. Conversely, where a petitioner challenges an agency's conclusion that a project's adverse environmental effects are adequately mitigated, we review the agency's conclusion for substantial evidence. (Vineyard, at p. 435.)
Substantial evidence for CEQA purposes is "enough relevant information and reasonable inferences from this information that a fair argument can be made to support a conclusion, even though other conclusions might also be
"In reviewing for substantial evidence, the reviewing court `may not set aside an agency's approval of an EIR on the ground that an opposite conclusion would have been equally or more reasonable,' for, on factual questions, our task `is not to weigh conflicting evidence and determine who has the better argument.'" (Vineyard, supra, 40 Cal.4th at p. 435; see Laurel Heights Improvement Assn. v. Regents of University of California (1988) 47 Cal.3d 376, 393 [253 Cal.Rptr. 426, 764 P.2d 278].) Rather, we must resolve any reasonable doubts and any conflicts in the evidence in favor of the agency's findings and decision. (Laurel Heights, at p. 393; Citizens for Responsible Equitable Environmental Development v. City of San Diego (2011) 196 Cal.App.4th 515, 522-523 [129 Cal.Rptr.3d 512].)
II
Claims Related to the Project's Biological Resources Impacts
A
Reliance on Draft Subarea Plan for Biological Resources Cumulative Impacts Analysis
Plaintiffs contend the EIR's cumulative biological resources impacts analysis violates CEQA because it improperly relied on the draft subarea plan. We conclude there is no merit to this contention.
An EIR must discuss a project's cumulative impacts "when the project's incremental effect is cumulatively considerable, as defined in section 15065(a)(3)." (Guidelines, § 15130, subd. (a).) "`Cumulatively considerable' means that the incremental effects of an individual project are significant
In this case, the EIR concluded the project's cumulative impacts on biological resources were not cumulatively considerable, except as to impacts on the grasshopper sparrow, which we discuss in more detail post. In reaching this conclusion, the EIR first discussed the development potential of the property surrounding the project. The only possible or anticipated development whose effects when combined with the project's effects might result in cumulatively considerable impacts was in the City of San Diego and the County of San Diego. Development in both jurisdictions is covered by the MSCP and by the jurisdictions' respective subarea plans. By assuming both jurisdictions would ensure subsequent development within their boundaries was consistent with the MSCP and their respective subarea plans, the EIR was relying on approved land use plans, which CEQA expressly permits. (§ 21100, subd. (e); see Guidelines, § 15130, subd. (d).)
The EIR's assumption that the City would also ensure subsequent development within its boundaries was consistent with either the draft subarea plan, if approved, or the MSCP requirements, if the draft subarea plan is not approved, similarly reflects permissible reliance on the MSCP. It also reflects a permissible recognition that "[a] project's contribution is less than cumulatively considerable if the project is required to implement ... its fair share of a mitigation measure or measures designed to alleviate the cumulative impact." (Guidelines, § 15130, subd. (a)(3).)
The biological resources technical report supports this interpretation of the EIR's cumulative impacts analysis. The report indicates the proposed development of the surrounding property was in the early planning stages and,
The EIR's discussion of cumulative impacts on the grasshopper sparrow does not alter our conclusion. The EIR explained that the grasshopper sparrow's habitat is annual grassland. It further explained that although more than 50 percent of the onsite annual grassland habitat will be conserved as open space, the project will reduce or eliminate wildfires. The reduction or elimination of wildfires could cause the annual grassland habitat to permanently convert to scrub habitat and contribute to a significant cumulative impact to the grasshopper sparrow.
While characterized as a cumulative impact, this particular effect of the project actually appears to be a long-term indirect impact. The effect's analysis was presumably prompted by, or at least related to, the City's decision not to adopt the open space fuel modification provisions of the fire
More importantly, the discussion of this effect does not undermine the rationale for the EIR's conclusion the project's biological impacts are not cumulatively considerable — the biological impacts of the potential development of the surrounding property were not known, but both the potential development and the project are subject to the MSCP, the project meets or exceeds the MSCP requirements and does not interfere with the potential development's compliance with the MSCP requirements, and the project's own impacts will be mitigated to below a level of significance. Accordingly, plaintiffs have not established the City improperly relied on the draft subarea plan to avoid analyzing the project's cumulative biological impacts, or that the EIR's analysis of the project's cumulative biological resources impacts is otherwise inadequate.
B
Feasibility of Acquisition of Offsite Mitigation Property
Plaintiffs contend the mitigation measure requiring the developer to acquire offsite mitigation property violates CEQA because the record does not show acquisition of such property is feasible. We conclude there is no merit to this contention either.
Moreover, contrary to plaintiffs' assertion, there is substantial evidence in the record to show acquisition of the mitigation property is capable of being successfully accomplished within a reasonable time period. Regarding the offsite property to be acquired in the north Magnolia Summit subunit, the record indicates the developer had identified approximately 88 acres of suitable property at the time the City certified the EIR. The record also indicates the developer was actively negotiating with property owners in the area and was confident it could acquire all the necessary acreage. Regarding the offsite Quino mitigation property, the record indicates the developer
The evidence plaintiffs rely upon to support their position is unpersuasive as the evidence involves communications significantly predating the formulation of the mitigation measure and discussing requirements not incorporated into it. Accordingly, plaintiffs have not met their burden of demonstrating the mitigation measure failed to comply with CEQA.
C
Deferred Mitigation of Quino Impacts
Plaintiffs contend the EIR provision providing for the postapproval formulation of the habitat plan's provisions for active management of the Quino within the preserve violates CEQA's proscription against deferred mitigation measures. We agree.
Thus, "`"for [the] kinds of impacts for which mitigation is known to be feasible, but where practical considerations prohibit devising such measures early in the planning process (e.g., at the general plan amendment or rezone stage), the agency can commit itself to eventually devising measures that will satisfy specific performance criteria articulated at the time of project approval. Where future action to carry a project forward is contingent on devising means to satisfy such criteria, the agency should be able to rely on its commitment as evidence that significant impacts will in fact be mitigated."'" (Defend the Bay v. City of Irvine (2004) 119 Cal.App.4th 1261, 1275-1276 [15 Cal.Rptr.3d 176].) Conversely, "`[i]mpermissible deferral of mitigation measures occurs when an EIR puts off analysis or orders a report without either setting standards or demonstrating how the impact can be
In this case, while the EIR contains measures to mitigate the loss of Quino habitat, the EIR does not describe the actions anticipated for active management of the Quino within the preserve. The EIR also does not specify performance standards or provide other guidelines for the active management requirement. The developer's reliance on the contents of the draft habitat plan to fill this gap is unavailing because the requirement for the Quino management section arose at the wildlife agencies' request after preparation of the draft habitat plan, indicating the draft habitat plan's discussion of Quino management activities was inadequate on this point.
The absence of standards or guidelines in the EIR for active management of the Quino within the preserve is problematic because the draft habitat plan indicates vegetation management is the key consideration for the Quino's conservation and the City will not be utilizing prescribed burns or grazing in the preserve, the only two methods of vegetation management the draft habitat plan identifies. In addition, the timing and specific details for implementing other Quino management activities discussed in the draft habitat plan are subject to the discretion of the preserve manager based on prevailing environmental conditions. Consequently, these activities are not guaranteed to occur at any particular time or in any particular manner.
Moreover, the EIR does not state nor is it readily apparent why specifying performance standards or providing guidelines for the active management of the Quino within the preserve was impractical or infeasible at the time the EIR was certified. The fact that the City and wildlife agencies must ultimately approve the habitat plan does not cure these informational defects. (San Joaquin Raptor Rescue Center v. County of Merced, supra, 149 Cal.App.4th at p. 670.) Accordingly, we conclude the City violated CEQA by improperly deferring formulation of this mitigation measure.
The recently published decision in Rialto Citizens for Responsible Growth v. City of Rialto (2012) 208 Cal.App.4th 899 [146 Cal.Rptr.3d 12] to which the
III
Claims Related to the Project's Water Supply Impacts
Plaintiffs contend the City's analysis of the project's water supply impacts violates CEQA because there is insufficient evidence an adequate long-term water supply exists for the project. More particularly, plaintiffs contend the district's assessment, upon which the EIR relies, does not provide firm assurance of adequate water supplies for the project because: (1) the assessment's estimation of the project's water demands differs appreciably from the EIR's estimation of the project's water demands; and (2) the assessment assumes that the district will receive a full supply of imported water during both wet and dry years and that water rationing will occur and will result in reduced water demand during single dry years. Plaintiffs additionally contend the EIR fails to address the unreliability of imported water sources due to drought, environmental constraints, and the contingent nature of future water development and infrastructure improvement projects. Plaintiffs also contend the EIR fails to analyze the environmental consequences of using alternative sources of water to fill and recharge the 10-acre lake portion of the project should the district decline to provide potable water for it. We agree with each of these points.
A
Nonetheless, the ultimate question under CEQA is whether the EIR adequately addresses the reasonably foreseeable impacts of supplying water to the project, not whether the EIR establishes a likely source of water. Thus, "[i]f the uncertainties inherent in long-term land use and water planning make it impossible to confidently identify the future water sources, an EIR may satisfy CEQA if it acknowledges the degree of uncertainty involved, discusses the reasonably foreseeable alternatives — including alternative water sources and the option of curtailing the development if sufficient water is not available for later phases — and discloses the significant foreseeable environmental effects of each alternative, as well as mitigation measures to minimize each adverse impact." (Vineyard, supra, 40 Cal.4th at p. 434.)
B
C
Also of concern is the contingent nature of the district's water supply projections. As the district explained in an October 2007 addendum to the assessment, because it receives all of its water from the water authority, the assessment's conclusions depend entirely on the water authority's and Metropolitan's water supply projections and reliability plans. In turn, Metropolitan's water supply projections and reliability plan, and by implication the water authority's, depend heavily upon the reliability of the water Metropolitan receives from the State Water Project. However, an August 2007 court decision created at least short-term uncertainty in Metropolitan's receipt of water from the State Water Project, and the district acknowledged in its
D
Of further concern is the dearth of information and analysis in the EIR regarding the water demands for the 10-acre lake portion of the project. The lake is intended to serve a storm water treatment function. The City's general plan requires and the EIR anticipated potable water would be used to fill the lake. The EIR also anticipated potable water would be used to recharge the lake when there was insufficient storm water runoff to do so. The EIR identified groundwater as the anticipated source of potable water to recharge the lake, but does not specifically identify a source of potable water to fill the lake. Although the record alludes to the use of groundwater for both purposes, the record does not support a conclusion there is sufficient groundwater for either purpose.
IV
Propriety of Limited Writ Remedy
Plaintiffs contend the trial court's use of a limited writ to remedy the City's CEQA violations was improper. More particularly, they contend that, whenever a trial court finds an EIR inadequate, the trial court must decertify the EIR and vacate all related project approvals. We disagree.
A
B
Plaintiffs' challenge to the limited writ remedy raises two interrelated questions: whether the trial court properly interpreted section 21168.9 as authorizing the limited writ remedy and whether the trial court properly exercised its equitable powers in utilizing the remedy in this case. We review the trial court's interpretation of section 21168.9 de novo. We review the trial court's exercise of its equitable powers for abuse of discretion. (Ho v. Hsieh (2010) 181 Cal.App.4th 337, 344-345 [105 Cal.Rptr.3d 17].)
1
2
Further, such a rigid requirement is not always necessary to ensure a public agency or a developer does not thwart or render CEQA compliance meaningless by proceeding with environmentally harmful project activities before the public agency corrects its CEQA violations. Section 21168.9 provides the court with other means of ensuring this does not occur as it expressly allows
C
Having concluded a trial court has the authority under section 21168.9 to issue a limited writ in appropriate cases, the question remains whether the trial court abused its discretion in doing so here. "`An abuse of discretion occurs when, in light of applicable law and considering all relevant circumstances, the court's ruling exceeds the bounds of reason.'" (Ho v. Hsieh, supra, 181 Cal.App.4th at p. 345.)
The trial court in this case opted for the limited writ remedy believing that the EIR's flawed fire safety analysis was the sole CEQA violation and that the project's fire safety impacts were discrete. We have since identified additional CEQA violations in the EIR's handling of the project's biological resources and water supply impacts. Moreover, during our review of plaintiffs' biological resources claims, we observed a strong interrelationship
V
Award of Attorney Fees and Costs
After the trial court issued the limited writ, plaintiffs filed a cost memorandum. The City and the developer filed a motion to strike or, alternatively, to tax costs. The trial court denied the motion to strike and awarded plaintiffs costs, finding plaintiffs were the prevailing parties because they "obtained relief against [the City] with respect to the fire protection plan," which "had a significant impact on the project as a whole."
Plaintiffs then moved for prejudgment and postjudgment attorney fees under Code of Civil Procedure section 1021.5. The trial court denied the motion for prejudgment attorney fees as untimely, but awarded postjudgment attorney fees of $45,555.50, finding the statutory requirements for such a fee award had been met.
The City and the developer contend we must reverse the cost award because the trial court erroneously determined plaintiffs were the prevailing parties. They contend we must reverse the attorney fee award for the same reason and also because the plaintiffs did not achieve a significant benefit from the litigation. They alternatively contend we must reverse the fee award because the trial court's ruling did not explain the basis for the fee award amount, except to state the amount did not include fees related to subsequent litigation between the parties. We conclude there is no merit to these contentions.
A
B
Given our conclusion in this appeal that there were additional CEQA violations, plaintiffs are unquestionably the successful parties in this litigation. Not only did they identify a significant flaw in the City's analysis of the project's fire safety impacts, but they also identified significant flaws in the City's analysis of the project's water supply impacts and mitigation of the project's Quino impacts. At least two of these flaws — the inadequate analysis of the project's fire safety impacts and the inadequate analysis of the project's water supply impacts — apply to the entire project and, consequently, warrant precluding any part of the project from proceeding until they are corrected. Further, the identification of these flaws and the corresponding need to correct them will compel the City to reconsider what it must do to comply with CEQA and, therefore, both results in the enforcement of important public interest laws and confers a significant benefit on the general public. (Center for Biological Diversity v. County of San Bernardino (2010) 185 Cal.App.4th 866, 892-893, 895 [111 Cal.Rptr.3d 374] [litigation to enforce CEQA involves important rights affecting the public interest and more indepth CEQA review confers a significant public benefit].) Finally, there is no evidence plaintiffs or its members have any financial interest in the outcome of this litigation and, as the enormous record, extensive briefing, and lengthy litigation path of this case amply demonstrate, the necessity and financial burden of private enforcement are such to make an attorney fee award appropriate. Accordingly, we conclude the trial court properly awarded plaintiffs costs and attorney fees
DISPOSITION
The judgment is reversed as to plaintiffs' claims that the EIR violates CEQA by improperly deferring mitigation of the project's impacts to the Quino and inadequately analyzing the project's water supply impacts. The judgment is affirmed in all other respects. Parties Preserve Wild Santee, Center for Biological Diversity, and Endangered Habitats League, Inc., are awarded costs and attorney fees on appeal. The matter is remanded to the trial court to determine the amount of appellate attorney fees and costs and for further proceedings consistent with this decision.
Haller, J., and Aaron, J., concurred.