McDEVITT, Chief Judge.
STATEMENT OF THE CASE
In 1986, the Bonneville Power Administration ("BPA") contracted with JOB Line, Inc. ("JOB") to erect a portion of the Taft-Bell 500 kilovolt ("kv") transmission line in North Idaho. The BPA contract required JOB to string high voltage transmission line between towers. This job compelled the use of a helicopter to pull the line as it unwound from a drum in a "triple-drum machine" through a guard structure on top...