BALDOCK, Circuit Judge.
In 1980, the Board of Public Utilities of Kansas City, Kansas was building a power plant known as the Nearman Creek Power Station. Appellant contracted to install a Westinghouse 235,000 kw turbine generator in the project. On December 30, 1980, the turbine shaft of the generator was damaged severely during performance testing due to the failure of the number 1 main bearing. The failure was caused by the disconnection of an oil lubricating line...