PER CURIAM.
The basic issue on appeal
The plaintiff and the defendants entered into a contract, the terms of which were that for a specified sum the plaintiff was to build masonry walls on premises owned by the defendants. The contract price was paid. After the walls were built, high winds blew down a substantial portion of the walls....