MR. JUSTICE WHITE delivered the opinion of the Court.
When the Boulder Canyon Project Act, 45 Stat. 1057, 43 U. S. C. § 617 et seq. (Project Act), became effective in 1929, a large area in Imperial Valley, Cal., was already being irrigated by Colorado River water brought to the Valley by a privately owned delivery and distribution system. Pursuant to the Project Act, the United States constructed and the Imperial Irrigation District (District) agreed to pay for a new diversion dam and a new canal connecting the dam with the District. The Project Act was supplemental to the reclamation laws, which as a general rule limited water deliveries from reclamation project to 160 acres under single ownership. The Project Act, however, required that the Secretary of the Interior (Secretary) observe rights to Colorado River water that had been perfected under state law at the time the Act became effective. In the course of contracting with the District for the building of the new dam and canal and for the delivery of water to the District, the United States represented that the Project Act did not impose acreage limitations on lands that already had vested or present rights to Colorado River water. The United States officially adhered to that position until 1964 when it repudiated its prior construction of the Project Act and sued the District, claiming that the 160-acre limitation contained in the reclamation law applies to all privately owned lands in the District, whether or not they had been irrigated in 1929. The District Court found for the District and its landowners, 322 F.Supp. 11 (SD Cal.
I
Imperial Valley is an area located south of the Salton Sea in southeastern California. It lies below sea level, and is an arid desert in its natural state. In 1901, however, irrigation began in the Valley, using water diverted from the Colorado River, which in that area marks the border between California and Arizona. Until at least 1940, irrigation water was brought to the Valley by means of a canal and distribution system that were completely privately financed. On June 25, 1929, when the Project Act became effective, the District
Prior to 1929 and for several years thereafter, the water diverted from the Colorado River was carried to the Valley through the Alamo Canal, which left the river north of the
The Project Act was the culmination of the efforts of the seven States in the Colorado River Basin to control flooding, regulate water supplies on a predictable basis, allocate waters among the Upper and Lower Basin States and among the States in each basin, and connect the river to the Imperial Valley by a canal that did not pass through Mexico.
Section 1 of the Project Act, which provided for the dam at Black Canyon, also authorized the construction of a new canal, the All-American Canal, which would replace the Alamo Canal and would traverse only territory located in the United States. A new diversion dam for Imperial Valley water was also authorized. Section 1 went on to provide that no charge should be made for the storage or delivery of irrigation or potable water to Imperial or Coachella Valley.
Section 6 of the Project Act, of critical importance in these cases, mandated that the works authorized by § 1 were to be used: "First, for river regulation, improvement of navigation, and flood control; second, for irrigation and domestic uses and satisfaction of present perfected rights in pursuance of Article VIII of said Colorado River compact; and third, for power." Section 9 authorized the opening to entry of the public lands that would become irrigable by the Project but in tracts not greater than 160 acres in size in accordance with the provisions of the reclamation law.
Section 14 provided that the Project Act should be deemed supplemental to the reclamation law, "which said reclamation law shall govern the construction, operation, and management
Pursuant to the Project Act, the United States and the District entered into a contract on December 1, 1932, providing for the construction of the Imperial Dam and the All-American Canal. The District undertook to pay the cost of the works, and to include within itself certain public lands of the United States and other specified lands.
Article 31 of the contract between the District and the United States provided that the United States would not be bound by the contract until and unless court proceedings had been instituted by the District and a final judgment obtained confirming the authorization and the validity of the contract.
The trial court in the Hewes case expressly found and concluded that eligibility for project water was not limited to 160-acre tracts in single ownership.
Meanwhile, it having become apparent that neither the Compact nor the Project Act settled to the satisfaction of the Lower Basin States how the water allocated to them should be divided, an original action was begun in this Court in 1952 to settle this fundamental question and related issues, including the ascertainment of present perfected rights the unimpaired preservation of which was required by both the Compact and the Project Act. After more than 10 years of litigation, the opinion in Arizona v. California was handed down on June 3, 1963. 373 U.S. 546. Although the dispute among the Lower Basin States was at the heart of the controversy, for present purposes the primary aspect of the case was the recognition given to present perfected rights in the opinion and the ensuing decrees.
The opinion recognized that under § 14 of the Project Act, the construction, operation, and management of the works were to be subject to the provisions of the reclamation law, except as the Act otherwise provided, and that one of the most significant limitations in the Project Act on the Secretary's authority to contract for the delivery of water is the requirement to satisfy present perfected rights, "a matter of intense importance to those who had reduced their water rights to actual beneficial use at the time the Act became effective." 373 U. S., at 584. The decree, which was entered on March 9, 1964, 376 U.S. 340, defined a perfected right as:
Present perfected rights were defined as those perfected rights "existing as of June 25, 1929, the effective date of the Boulder Canyon Project Act." Ibid. The decree also provided for the future determination of the specific present perfected rights in each of the Lower Basin States. A supplemental decree was eventually forthcoming, 439 U.S. 419 (1979), and in that decree the Imperial Irrigation District was adjudged to have a present perfected right
As already indicated, the Department of the Interior repudiated the Wilbur interpretation of the Project Act in 1964. It then sought to include its revised position in a renegotiated contract with the District. When the District refused to accept the Department's position, the United States sued the District in 1967 for a declaratory judgment that the excess-acreage limitation of § 46 applied to all private lands in the Valley. The District Court permitted several Imperial Valley landowners to intervene as defendants representing the certified class of all landowners owning more than 160 acres.
Because of the importance of these cases, we granted the petitions for writs of certiorari filed by the District, the landowners, and the State of California. 444 U.S. 978 (1979).
II
As a preliminary matter, we agree with the Court of Appeals that the respondents who sought to enter the suit when the United States forwent an appeal from the District Court's adverse decision had standing to intervene and press the appeal on their own behalf. Respondents, most of whom are farmworkers, reside in Imperial Valley. The essence of their claim was that they desired to purchase farmlands in Imperial
III
We are unable, however, to agree with the Court of Appeals that Congress intended that the 160-acre limitation of the 1926 Act would apply to the lands under irrigation in Imperial Valley in 1929.
Concededly, nothing in § 14, in § 46, or in the reclamation law in general would excuse the Secretary from recognizing his obligation to satisfy present perfected rights in Imperial Valley that were provided for by Art. VIII of the Compact and § 6 of the Project Act and adjudicated by this Court in Arizona v. California, 373 U.S. 546 (1963). The Court of Appeals neverthless held that § 46 could be applied consistently with § 6 because the perfected rights in Imperial Valley were owned by and would be adjudicated to the District, not to individual landowners, who were merely members of a class for whose benefit the water rights had been acquired and held in trust. Individual farmers, the Court of Appeals said, had no right under the law to a particular proportion of the District's water. Applying § 46 and denying water to excess lands not sold would merely require reallocation of the water among those eligible to receive it and would not reduce the water which the District was entitled to have delivered in accordance with its perfected rights.
We find this disposition of the § 6 defense to the application of the 1926 Act's acreage limitation to be unpersuasive. Arizona v. California, supra, at 584, recognized that "one of the most significant limitations" on the Secretary's power under the Project Act was the requirement that he satisfy present perfected rights, a matter of great significance to those who had reduced their water rights to beneficial use prior to 1929. Accordingly, in our initial decree, the perfected right protected by § 6 was defined with some care: a right that had been acquired in accordance with state law and that had been exercised by the actual diversion of a specific quantity of water
In the first place, it bears emphasizing that the § 6 perfected right is a water right originating under state law. In Arizona v. California, we held that the Project Act vested in the Secretary the power to contract for project water deliveries independent of the direction of § 8 of the Reclamation Act to proceed in accordance with state law and of the admonition of § 18 of the Project Act not to interfere with state law. 373 U. S., at 586-588.
It may be true, as the Court of Appeals said, that no individual farm in the District has a permanent right to any specific proportion of the water held in trust by the District. But there is no doubt that prior to 1929 the District, in exercising its rights as trustee, delivered water to individual farmer beneficiaries without regard to the amount of land under single ownership. It has been doing so ever since. There is no suggestion, by the Court of Appeals or otherwise, that as a matter of state law and absent the interposition of some federal duty, the District did not have the right and privilege to exercise and use its water right in this manner. Nor has it been suggested that the District, absent some duty or disability imposed by federal law, could have rightfully denied water to individual farmers owning more than 160 acres. Indeed, as a matter of state law, not only did the District's water right entitle it to deliver water to the farms in the District regardless of size, but also the right was equitably owned by the beneficiaries to whom the District was obligated to deliver water.
The Court of Appeals said it would not be a breach of trust by a water district to obey the dictates of § 46, relying on Ivanhoe Irrig. Dist. v. All Parties and Persons, 53 Cal.2d 692, 712, 350 P.2d 69, 81 (1960). But the issue here is whether § 46 applies to lands already being irrigated in 1929. In the Ivanhoe proceedings, the courts were not dealing with perfected rights to water that the project there involved would furnish, nor with a Project Act that specifically required present perfected rights to be satisfied. Here, we are dealing with perfected rights protected by the Project Act; and because its water rights are to be interpreted in the light of state law, the District should now be as free of land limitations with respect to the land it was irrigating in 1929 as it was
It should also be recalled that we defined a present perfected right as one that had not only been acquired pursuant to state law but as one that had also been exercised by the diversion of water and its actual application to a specific area of land. We did not intend to decree a water right to the District under this definition, conditioned upon proof of actual diversion and use, but nevertheless to require the District to terminate service to the lands on the basis of which the right was decreed. The District has itself no power to require that excess lands be sold, and it is a contradiction in terms to say, as the Court of Appeals did, that the District has present perfected rights but that § 46 requires it to terminate deliveries to all persons with excess lands who refuse to sell.
IV
The legislative history of the Project Act, which spans several years, raises no doubt in our minds about the foregoing construction of the Act.
V
There remains a further consideration. The parties stipulated and the District Court found that at the outset of this litigation, the District was irrigating approximately 14,000 more acres than the 424,145 acres under irrigation in 1929. If, in light of our perfected rights holding, an Art. III case or controversy remains with respect to the applicability of
Accordingly, the judgment of the Court of Appeals is reversed with respect to those lands that were irrigated on June 25, 1929, and with respect to which the District has been
So ordered.
FootNotes
Difficulties also arose because the Alamo Canal passed through Mexican territory and hence was partly subject to Mexican sovereignty. As a Senate Committee remarked, a new canal would "end an intolerable situation, under which the Imperial Valley now secures its sole water supply from a canal running for many miles through Mexico. . . ." S. Rep. No. 592, 70th Cong., 1st Sess., 8 (1928).
"During the deliberations of the Colorado River Commission at Santa Fe, and after 10 days' work, a sketch or outline of the progress was released to the press, stating what had happened and the proposed terms of a treaty. . . . The Imperial Valley representatives were immediately responsive. They came before the Commission and presented their claims with great vigor. . . .
"In view of that claim, coming as it did from people who cultivated upward of half a million acres of very valuable land, . . . Article VIII of the compact was drawn at the last session of the proceedings." Hearings Pursuant to S. Res. 320 before the Senate Committee on Irrigation and Reclamation, 68th Cong., 2d Sess., pt. 1, p. 678 (1925).
"No water shall be delivered upon the completion of any new project or new division of a project until a contract or contracts in form approved by the Secretary of the Interior shall have been made with an irrigation district or irrigation districts organized under State law providing for payment by the district or districts of the cost of constructing, operating, and maintaining the works during the time they are in control of the United States, such cost of constructing to be repaid within such terms of years as the Secretary may find to be necessary, in any event not more than forty years from the date of public notice hereinafter referred to, and the execution of said contract or contracts shall have been confirmed by a decree of a court of competent jurisdiction."
In addition, the law of California specified preconditions to the effectiveness of water district contracts. Approval by the governing body was required as well as by district members voting in an election for that purpose. A district was also permitted to submit the contract to Superior Court for validation proceedings. The decree in Hewes v. All Persons, discussed in the text, concluded that California law had been satisfied in all respects.
In 1942, in response to inquiry from the Federal Land Bank as to the applicability of the 160-acre limitation in Imperial Valley, the Commissioner of the Bureau of Reclamation replied in the negative. In 1944, Assistant Commissioner of Reclamation Warne testified before a Senate Subcommittee that "the limitation was never applied under the law to the Imperial Valley, except as a matter of new lands . . . ," and went on to make the Wilbur letter part of the Subcommittee's record. Hearings on H. R. 3961 before a Subcommittee of the Senate Committee on Commerce, 78th Cong., 2d Sess., pt. 4, pp. 599, 764-765 (1944).
In 1945, the Solicitor of the Interior Department ruled that the 160-acre limitation was applicable to Coachella Valley. 71 I. D., at 533. In the course of the opinion, he also disagreed with the Wilbur letter with respect to Imperial Valley, but did not purport to overrule it. In 1948, Secretary Krug, in response to an inquiry from a veterans' organization, issued a letter affirming the Department's adherence to the Wilbur ruling. App. 253a-254a.
In 1952, after several years of negotiations, changes were effected in the 1932 contract between the District and the United States, but the Department did not insist that an acreage limitation be included or that the Wilbur position be abandoned.
In response to inquiry from the Solicitor General in 1958, the then Solicitor of the Department of the Interior reaffirmed the Department's position with respect to the Wilbur letter. Id., at 255a-260a. The Solicitor General, however, without the concurrence of the Department, answered the inquiry of the Special Master in Arizona v. California, suggesting that the question of acreage limitations was irrelevant to the proceedings before the Master but also indicating in a footnote his disagreement with the Wilbur letter and the Department's position. App. 260a-263a. Also in 1958, the Solicitor General expressed the same opinion in the Ivanhoe litigation. Brief for United States as Amicus Curiae in Ivanhoe Irrig. Dist. v. McCracken, O. T. 1957, Nos. 122 et al., p. 37, n. 9. It was not until 1964 that the Secretary repudiated the Department's prior position. 71 I. D. 496.
While the prospect of windfall profits could attract a large number of potential purchasers of the excess lands, respondents' interest is not "shared in substantially equal measure by all or a large class of citizens," Warth v. Seldin, 422 U.S. 490, 499 (1975), because respondents are residents of the Imperial Valley who desire to purchase the excess land for purposes of farming.
In the Ivanhoe litigation, the California Supreme Court originally determined that to deny water to farms in excess of 160 acres in single ownership would contravene § 22250, and would work a denial of due process and equal protection of the laws. Following this Court's decision that the 160-acre limitations contained in irrigation contracts for the Central Valley Project were mandated by federal reclamation law, the California Supreme Court, on remand, held that in light of this Court's opinion, water could be denied to farms exceeding the acreage limitation without violating state law. Ivanhoe Irrig. Dist. v. All Parties and Persons, 53 Cal.2d 692, 350 P.2d 69 (1960). However, the court's decision made clear that absent an overriding provision of federal law imposing an acreage limitation, state law debars an irrigation district from denying water to farms on the basis of size.
"1) The inclusion within the District by annexation, pursuant to Article 34 of the contract between the Government and the District dated December 1, 1932, of some 250,000 acres of Government lands.
"2) Added capacity in the Canal for the servicing of such lands and some 11,000 acres of Indian land.
"3) Flood control for the purpose of preserving the Laguna Dam and protecting the Yuma Reclamation Project as well as protecting the public lands and private interests in Imperial Valley.
"4) The control of silt because of the federal government's problem in handling silt in the Yuma Project.
"5) The need to build a canal on All-American soil to put the United States in a position to bargain with the Mexican Government over the use of the water of the Colorado River.
"6) It enabled the United States Government to reclaim and put to use large tracts of public and Indian lands of the United States in Coachella Valley." 322 F. Supp., at 19.
The District Court concluded that Congress was aware of the water rights held in Imperial Valley and determined to exempt them from the acreage limitations "in recognition of the fact that the All-American Canal Project was not merely an arid lands reclamation project, but was a special purpose program designed for national purposes, including water negotiations with Mexico, as well as for regional agricultural development." Id., at 22.
The Senate Report on S. 728, S. Rep. No. 592, 70th Cong., 1st Sess. (1928), stated several purposes of the Project, one of which was that it would "end an intolerable situation, under which the Imperial Valley now secures its sole water supply from a canal running for many miles through Mexico, as well as make possible the reclamation of public lands lying around the rim of the present cultivated section of the valley." Id., at 8. The Report also stated as follows:
"The all-American canal will carry a portion of the conserved waters to where they can be used for irrigation and domestic purposes. Looked at in a somewhat narrow way, it represents a cooperative enterprise between Imperial irrigation district, which serves the present irrigated area in Imperial Valley, the Coachella County water district, a public district embracing in its limits the Coachella Valley, and the United States as owner of approximately 200,000 acres of public land about the rim of Imperial Valley, and about 11,000 acres of Indian lands now without water but possessing the same possibilities of development with water as the fertile lands in the valley. Neither Imperial irrigation district, the Coachella district, nor the United States could afford alone to build a canal from the river. Acting in conjunction, the canal is entirely feasible." Id., at 21.
The House Report on H. R. 5773, H. R. Rep. No. 918, 70th Cong., 1st Sess., 6 (1928), also identified one of the purposes of the Project as ending the "intolerable situation" which existed in Imperial Valley:
"This valley now secures its sole water supply by a canal which runs for some 60 miles through Mexico. The all-American canal will furnish a substitute for this and at the same time carry the water at an elevation sufficient to make possible, at some future date, the irrigation of additional land, mostly public, lying about the rim of the cultivated area."
"Early in the negotiations connected with the All-American Canal contract the question was raised regarding whether and to what extent the 160-acre limitation is applicable to lands to be irrigated from this proposed canal. So far as I am advised, all who have given this matter consideration agree that this limitation does not apply to lands now cultivated and having a present water right. The view has been, and is, I believe, that these lands having already a water right, are entitled to have such right recognized without regard to the acreage limitation mentioned." App. 220a.
The Department's repudiation of its prior position in 1964 was based on its Solicitor's view that § 46 of the 1926 Act applied to Imperial Valley by virtue of § 14 of the Project Act and that under that section no farmer in Imperial Valley could have project water for more than 160 acres of land. Excess lands must either be sold or the District must deny water to them. The Solicitor's opinion, however, gave only cursory attention to § 6. After stating that the proper rule of construction in cases such as he was considering was that "rights, privileges and immunities not expressly granted are reserved," the opinion went on to conclude:
"For the same reason the requirement in section 6 for `satisfaction of present perfected rights' cannot be read as insulating the District lands from acreage limitation. It is not in plain terms an exemption from the limitations of reclamation law in connection with the obligation to repay the cost of Imperial Dam and the All-American Canal." 71 I. D., at 511.
We agree with the District Court's conclusion that this is a totally inadequate conception of perfected rights.