In November, 1964, the appellants began constructing a sanitary sewer trunk line on a public utility easement in close proximity to appellees' home. The easement passed through wet lands that required temporary draining of the subsurface water so the sewer could be installed. The appellants drove 12-feet deep well points along the sewer construction trench in order to pump water out or lower the water level...