Per Curiam.
The Court of Claims properly found that claimant contractor was entitled to recover the cost of removal of unsuitable materials from the park site but should have deducted from the excavation cost figure of $17,057.64, which included the cost of removal, the amount of $7,822.90 paid to claimant for excavation, so as to reduce the award to $9,234.74 and interest. The award of $7,100.59 for the increased cost of relocating a power line cannot be sustained...