This claim arises under a contract for electric work at the Marcy State Hospital. Claimant seeks to recover the sum of $11,696.60 alleging that this was the cost of extra work and additional material required by the State beyond the limits of the contract.
Under the contract, the claimant was required to install a considerable amount of underground electrical conduit, with manholes where the conduit changed direction. Standard...