COUNIHAN, J.
This is an action of contract in which the plaintiffs allege that they were the owners of a building; that the defendant sometime during the period from May 1 to July 1, 1952, contracted with the plaintiffs to bring to full operating capacity the water sprinkler system, which the defendant many years before had installed in the building; and that the defendant failed to make the system fully operable with the result that a fire which occurred in the building...