ORDER
KRISTI K. DUBOSE, Chief District Judge.
This matter is before the Court on: 1) Plaintiff Glovis Alabama, LLC (Glovis)' motion for partial summary judgment on its breach of contract claim (Doc. 88); 2) Richway's cross-motion for partial summary judgment as to tax charges and attorneys' fees (Doc. 93); and 3) Richway and Intervenor Defendant Richardson Alabama Equipment Leasing, Inc. (RAEL)'s motion for partial summary judgment as to Glovis' claim of conversion and fraud (Doc. 102).
I. Procedural Background
On November 12, 2018, Plaintiff Glovis Alabama, LLC (Glovis) initiated this action against Richway Transportation Services, Inc. (Richway) in the Circuit Court of Mobile County, Alabama (Glovis Alabama, LLC v. Richway Transp. Servs., Inc., 02-CV-2018-902866). (Doc. 1-1). Based on Richway's indebtedness under a contract between Glovis and Richway for leased equipment (trailers), Glovis alleged breach of lease, replevin and unjust enrichment, and sought an order for the release of property and for monetary damages ($370,506), pre/post judgment interest, attorneys' fees, and costs.
On December 14, 2018, Richway removed this case on the basis of federal diversity subject matter jurisdiction. (Doc. 1). On December 21, 2018, Richway answered and counterclaimed against Glovis for claims stemming from a rail and transportation services contract. (Doc. 2). Specifically, Richway alleged counterclaims against Glovis for: "suit on sworn account pursuant to
On April 30, 2019, Richway moved to amend its answer/counterclaim, "to identify RAEL as the owner" of the equipment at issue (versus Glovis) because: "[r]eview of State of Alabama Certificates of Title confirm the majority — and likely all — of the Equipment is owned by . . . [RAEL]. . . . which is not a party to the Lease Agreement . . . Alabama Department of Revenue license and registration receipts similarly identify RAEL as the owner. . . ." (Doc. 33 at 3-4). Richway further sought to delete its prior assertions that the lease agreement was a finance contract for Richway's purchase of the equipment, and to add that RAEL is the proper title holder and owner of the equipment. (
On May 24, 2019, Richardson Alabama Equipment Leasing, Inc. (RAEL) filed a Rule 24(a)(2) motion to intervene, supported by the Affidavit of RAEL representative Nolan Richardson. (Doc. 35; Doc. 35-1 (Aff. N.Richardson)). With same, RAEL asserted that it, not Glovis, is the true owner of the equipment, and sought intervention to protect its rights. Specifically, per RAEL:
(Doc. 35 at 3-4 (footnotes omitted, emphasis in original)). Thus, the Richardson Affidavit asserts that in June/July 2016, RAEL acquired 12 trailers "directly from Transcraft[ ]" which have "remained under RAEL's ownership and subject to RAEL's control[,] "Glovis had never been in possession" of the trailers, and "RAEL has not transferred, granted or otherwise conferred any ownership, possessory, or security interest" in the trailers to Glovis. (Doc. 35-1 at 2 (Aff. N.Richardson)).
Glovis opposed the intervention, contending Richway is acting "surreptitious[ly]" and in bad faith with RAEL, to take Glovis' equipment without payment, when RAEL is not a necessary party. (Doc. 40). Glovis argued that RAEL "could not logically be the owner" of the equipment per Richway's own assertions, and that RAEL and Richway are related entities working together to avoid payment to Glovis.
This Court granted RAEL's motion to intervene, concluding (in part):
(Doc. 41).
Thereafter, Glovis filed an amended complaint against RAEL and Richway alleging: 1) breach of the lease agreement (contract) by Richway (Count I); 2) replevin against Richway (Count II); 3) unjust enrichment against Richway and RAEL (Count III); 4) conversion against Richway and RAEL (Count IV); and 5) fraud against Richway and RAEL (Count V). (Doc. 58.) Richway answered and filed counterclaims against Glovis again alleging: 1) suit on sworn account (
II. Findings of Fact 2
An equipment lease agreement between Glovis and Richway — the Glovis-Richway lease, is the genesis of this case. Specifically, from April 21-May 18, 2016, Glovis and Richway discussed obtaining trailers for Richway's use in the transportation services that it provided to Glovis. (Doc. 102-1 at 36 (Supp. Aff. Kim at 2)). According to Glovis, it agreed to purchase the trailers and lease them to Richway on a "rent to own" basis. (
On June 23, 2016,
Glovis arranged for the trailers to be delivered from Transcraft to Richway at different times per the lease (delivery/payment schedules tied to each trailer), after which Glovis would pay Transcraft. (Doc. 103-1 at 5 (Dep. Kim at 55); Doc. 102-1 at 37 (Supp. Aff. Kim at 3); (Doc. 88-1 at 3-4 (Aff. Kim at 2-3, and Exs. A-D thereto)). Some invoices were issued in the name of the Richardson Companies (which includes Richway and RAEL) and RAEL, but there is no dispute that only Glovis paid the invoices. (Doc. 92-2 at 27, 30-33 (Dep. Kim at 116, 134-137)).
The Glovis-Richway lease (Doc. 102-1 at 62-74) is between Glovis and Richway only. The lease is an agreement for Richway to lease "certain tangible property" from Glovis. (Doc. 102-1 at 64). The lease clearly provides that Glovis owns the trailers and Richway has no rights, title, or interest therein other than specified in the lease:
(Doc. 102-1 at 65; Doc. 102-2 at 7 (Dep. Shukla at 28-29)).
Regarding default, the lease provides:
(Doc. 102-1 at 65; Doc. 102-2 at 7 (Dep. Shukla at 27-28); Doc. 88-1 at 4 (Aff. Kim at 3)).
Moreover the lease prohibits Richway's assignment of the lease or interests in the trailers without Glovis' prior written consent:
(Doc. 102-1 at 66; Doc. 102-2 at 8 (Dep. Shukla at 33)).
The lease also contains a merger clause:
(Doc. 102-1 at 65).
And the lease provides that Richway (Lessee) reports, pays, and discharges all taxes, licenses, fees, etc. including sales use taxes "whether or not the same shall be assessed against or in the name of Lessor [Glovis] . . ." (Doc. 102-1 at 64; Doc. 103-1 at 16 (Dep. Kim at 182)).
In June 2016, pursuant to Exhibit A-1 of the lease, Glovis arranged for two (2) trailers to be delivered to Richway for $1,434/month, beginning in June 2016 and ending in May 2020. On June 27, 2016, Shane Wells (Transcraft/Wabash)
On July 13, 2016, Carr (Transcraft) emailed Shukla (Richway) and Wanda Calhoun (Transcraft) noting that Transcraft had received the "MSOs" but that she did not see a note indicating "what they should read. What name and address do you want on them?" (Doc. 102-1 at 77; Doc. 102-2 at 9 (Dep. Shukla at 35-37)). No representative of Glovis was included on this email. There is also no explanation in the record as to why Transcraft contacted Richway for this information, rather than Glovis. On July 14, 2016, Transcraft issued certificate of origins for the trailers in the name of non-contracting party RAEL, as the Distributor, stating the property "is transferred" to RAEL. (Doc. 102-1 at 130, 132, 134, 136, 138, 156, 158, 161). On July 13, 2016, Shukla (Richway) emailed Transcraft requesting that it "re-issue the MSO" in RAEL's name. (Doc. 102-1 at 76; Doc. 102-2 at 9 (Dep. Shukla at 36-37)). Again, no representative of Glovis was included on this email.
On August 1, 2016, Richway (Richardson) and Glovis (Kim and Garvin) met to discuss the payment process for Glovis leasing the 12 trailers to Richway. (Doc. 102-1 at 81-82 (Meeting Minutes). The minutes state that Richway agreed that Glovis has the right to deduct or write-off any monthly lease receivables from payables for Richway (for Transportation services). (Id.)
From August 30, 2016 to September 27, 2016, Transcraft (via Carr) communicated with Mike Kim (Glovis) via emails regarding payments and invoices on the trailers. (Doc. 102-5 at 1-8) The evidence indicates that the only possible notice to Glovis of the MSOs being issued in RAEL's name came in the form of a September 27, 2016 email; namely, that Leslie Garvin (with Glovis) was cc'd on an email string inquiry about a different issue — payments and providing invoices for the trailers (with the email string relating to MSOs embedded at the end of the email discussion chain but not in the subject line). However, there is no indication that Garvin (Glovis) was asked to approve how the MSOs were issued or that the MSOs were brought to her attention at that time. (Doc. 102-2 at 10 (Dep. Shukla at 38-39)). Shukla contends that this email to Garvin, was notice to Glovis that the trailers would be titled in RAEL's name. (
Per Kim, Glovis did not understand the significance of MSOs referenced within an email chain discussion when the email was regarding a separate issue. (Doc. 102-1 at 11-12 (Dep. Kim at 63-64, 68)). Kim explains that "every week we have like one thousand invoices from everywhere[ ]" and the invoices being submitted to Glovis' accounting department would not have notified Kim that RAEL was having the trailers issued in its name. (Doc. 92-2 at 34-35 (Dep. Kim at 142, 147)).
In October 2016, per Exhibit B-1 of the Lease, an additional four (4) trailers were delivered to Richway for $2,868/month, beginning in October 2016 and ending in September 2020. Richway then, unbeknownst to Glovis, executed a lease with RAEL for the same 12 trailers that are the subject of the Glovis-Richway lease. On October 1, 2016, RAEL (naming itself as Lessor) began leasing the trailers to Richway (named as Lessee), by executing a series of "internal" equipment lease agreements (with no consideration exchanged for same) "to let them operate[ ]". (Doc. 107-2 at 9 (Dep. N.Richardson at 27); Doc. 99-1 at 19-20, 26-28, 71-72 (Dep. Shukla at 18-19, 25-27, 70-71); Doc. 99-1 at 214-218 (1/1/17-12/31/17 lease), 219-223 (4/1/07-3/31/07 lease), 224-228 (10/1/16 lease)). The only explanation of record for RAEL and/or Richway's unilateral action is given by Shukla: "that is how the structure is set up on the tax attorneys and CPA's advice for a long time. . . . [RAEL] showed it as their equipment and created a lease agreement between Richway. . . . . . and. . . . [RAEL] so they can operate those equipment." (Doc. 99-1 at 19-20 (Dep. Shukla at 18-19)). This was done without Glovis' permission or knowledge. (Doc. 99-1 at 29-30, 72-74 (Dep. Shukla at 28-29, 71-73)).
Without any knowledge of Richway and RAEL's actions, Glovis continued performing under the Glovis-Richway lease. In December 2016, per Exhibit C-1 of the Lease, four (4) additional trailers were delivered to Richway for $4,332/month, beginning in December 2016 and ending in November 2020. In January 2017, per Exhibit D-1 of the Lease, two (2) additional trailers were delivered to Richway for $2,296/month, beginning in January 2017 and ending in December 2020. Glovis billed Richway via four (4) invoices per the delivery dates.
Glovis collected sales tax on each Richway payment and remitted that tax to the relevant taxing authorities for state, county, and city sales taxes. (Doc. 101-1 at 3 (Decltn. Leng)).
In March 2017, Glovis first became aware that the trailers' titles had been issued in non-contracting party RAEL's name. Per Kim, he never saw a reference to RAEL before then. (Doc. 92-2 at 19 (Dep. Kim at 53)). On March 3, 2017, Kim (Glovis) emailed Transcraft: "the company must change on Certificate of Origin. . . . Glovis purchased the units but it show[s] . . . RAEL. . . . the letter should show `Glovis Alabama LLC.' Please reissue the certificate or origin. . . . ." (Doc. 102-1 at 160). Subsequent Kim (Glovis) — Transcraft emails that day indicate the originals were sent to Mike Richardson, which would need to be returned before replacements could be provided. (Doc. 102-1 at 159). Kim (Glovis) contacted Mike Richardson (Richway) to have them correct the titling error. (Doc. 102-1 at 38 (Supp. Aff. Kim at 4)). Kim (Glovis) called Shukla (Richway) to explain the title should be in Glovis' name, and Shukla indicated that he understood; per Kim, Shukla told him he would change the title and list Glovis as the owner. (Doc. 102-1 at 11, 12 (Dep. Kim at 64-65, 68); Doc. 106-1 at 9 (Dep. Shukla at 193)). Kim alerted Mike Richardson (Richway) that the title in RAEL's name was a problem based on the lease terms specifying that Glovis has ownership of the trailers and Richway could not have any ownership until they paid the full lease amount. (Doc. 102-1 at 12, 30 (Dep. Kim at 68-69, 172)). Glovis then began efforts to correct the title to the trailers. (
(Doc. 102-1 at 39 (Supp. Aff. Kim at 5); Doc. 102-1 at 97-100 (emails); Doc. 92-2 at 41-42, 46 (Dep. Kim at 179-180, 188)).
Shukla (Richway) did not respond in writing to Kim's emails but instead called Kim assuring that changes to the title were being made and title would be reissued in Glovis' name. (Doc. 102-1 at 40 (Supp. Aff. Kim at 6); Doc. 102-1 at 13 (Dep. Kim at 72-73); Doc. 106-1 at 9 (Dep. Kim at 193)). On April 20, 2017, Shukla suggested adding Glovis as a lienholder to RAEL's titles to the trailers and Glovis initially said yes, but the next day reconsidered and asserted that Glovis had to be the listed title owner per the Glovis-Richway lease. (Doc. 102-1 at 14-15, 32 (Dep. Kim at 76-77, 79, 184)). However, no title changes were made.
In January 2018, Richway stopped making payments to Glovis due to disputes between the parties unrelated to the equipment lease. (Doc. 88-2 at 5 (Dep. Shukla at 66); Doc. 101-1 at 3 (Decltn. Leng at 2)). Instead, Richway started setting-off the payments owed to Glovis from the receivables Glovis owed Richway for trucking services. (Doc. 105-1 at 3-4 (Dep. Shukla at 67-68)).
Glovis has declared Richway in default. The default provision in the lease permits Glovis to accelerate the indebtedness and require Richway to pay all outstanding amounts remaining under the Lease. Glovis contends Richway owes $372,555.50 under the Lease. This amount represents outstanding payments from February 2018 to June 2020 (the end of the Lease term).
Per Glovis, Richway has paid $172,904.64 under the lease either through payments from Richway or set-off by Glovis. On August 29, 2018, Glovis demanded payment from Richway per the terms of the Glovis-Richway lease due to Richway's default. (Doc. 106-2 at 2-3 (8/29/18 demand letter)). On February 20, 2019, Glovis again demanded payment from Richway, as well as return of the leased equipment. (Doc. 106-2 at 4-5 (2/20/19 demand letter).
III. Standard of Review
"The court shall grant summary judgment if the movant shows that there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law." FED. R. CIV. P. 56(a). Rule 56(c)(1)-(4) provides as follows:
The movant bears the "initial responsibility of informing the district court of the basis for its motion, and identifying those portions of `the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any,' which it believes demonstrate the absence of a genuine issue of material fact."
The Rule 56 standard is not affected by the filing of cross-motions.
IV. Conclusions of Law 11
A. Glovis v. Richway Partial MSJs: Breach of Contract, Damages, Taxes, Attorneys' Fees/Costs
Glovis moves for partial summary judgment against Richway on its claims for breach of contract and damages (including attorneys' fees) under the terms of the equipment lease. Specifically, Glovis seeks to enforce the acceleration clause in the Lease based on Richway's breach of contract, to collect the indebtedness owed. Additionally, Glovis seeks a determination by this Court that Richway is liable for attorneys' fees/costs based on the lease, which provides that Glovis may recover: "costs, expenses . . . including reasonable attorney's fees and costs, arising out of, connected with, or resulting from [Richway's] use of the Equipment, including without limitation the manufacture, selection, delivery, possession, use, operation, or return of the Equipment." Glovis argues Richway is not permitted to set-off any debts against its outstanding/unpaid invoices.
In response, Richway argues that it "never breached" the lease due to non-payment because Glovis owes Richway a larger sum of money on a different contract for rail/trucking services, than Glovis seeks from Richway in lease payments. Accordingly, Richway claims that it set-off Glovis' unpaid invoices from the lease payments based on a "legal right" and "history between the parties permitting setoffs." (Doc. 92 at 2). Richway adds that the lease does not provide for recovery of attorneys' fees and neither does Alabama law. (Id.) Richway further argues that taxes are not recoverable by Glovis under the lease.
1. Evidentiary Objections
Richway objects to the deposition of Krish Shukla, the Declaration of Freda Leng, and portions of the Affidavit of Mike Kim, submitted by Glovis in support of its motion for summary judgment. Pursuant to amended
a. Krish Shukla's deposition (Doc. 88-2)
Richway moves to exclude Krish Shukla's deposition (Doc. 88-2), asserting that it is an uncertified incomplete deposition (lacking a signed reporter's certification attesting to the true and correct nature of the record of deponent's testimony) and fails to account for Shukla's Errata sheet. (Doc. 92 at 3-4). Richway's motion is denied. Given the nature of the exhibit (a deposition), the Court finds that it could readily be authenticated and reduced to admissible form, and Richway offers no reason why Shukla's deposition testimony cannot be so reduced.
b. Affidavit of Mike Kim (Doc. 88-1)
Richway objects to the Court's consideration of Paragraphs 4-8 and 13 of the Affidavit of Mike Kim, asserting such should be disregarded on summary judgment as violative of Rule 56(c)(4). (Doc. 92 at 4-6 (citing Doc. 88-1)). As grounds, Richway asserts as follows: 1) Paragraph 4 is not supported by the evidence, is an ultimate issue assertion, is a conclusory statement, and is a legal conclusion; 2) Paragraphs 5-8 are ultimate issue assertions, conclusory statements, and legal conclusions unsupported by the evidence of record; and 3) Paragraph 13 fails to affirmatively show or demonstrate how Kim is competent to testify to the tax matters, contains inadmissible hearsay regarding statements/opinions received from Glovis' accountants, is not based upon Kim's knowledge or experience, and is unsubstantiated.
With regard to Richway's objections based on hearsay, knowledge, or experience, Kim's affidavit states and verifies that he has access to Glovis' business records as they relate to Richway and that he reviewed same in order to provide facts about which he has personal knowledge and an accurate summary of the records for the Affidavit. (Doc. 88-1 (Aff. Kim at 1)). A corporate representative's review of relevant financial records establishes the requisite personal knowledge to attest to same.
Regarding Paragraphs 4-8, the exhibits attached to Kim's Affidavit support Kim's description of the delivery of trailers and Glovis' payments for same, and the evidence of summary judgment confirms that Glovis purchased the 12 trailers. (Doc. 88-1 at 1-19 (Aff. Kim at Ex. A thereto (The Lease) and Exs. A-1 through D-1 thereto (The Trailer Delivery Schedule))). Thus, despite Richway's characterization, there are no ultimate issue assertions, conclusory statements, and/or legal conclusions rendered by Kim in these paragraphs, simply a description of what these documents state. Richway's objection to Paragraphs 4-8 is
c. Declaration of Freda Leng
Richway seeks to exclude Leng's declaration and attachments claiming such is from a witness not identified in discovery under Rule 37(c), as irrelevant to the Glovis-Richway lease, hearsay, hearsay within hearsay, and was prejudicially not timely disclosed. (Doc. 103 at 2-4). The objection is
2. Breach of Contract
To establish a breach of contract in Alabama, Glovis must show: 1) the existence of a valid contract binding the parties; 2) Glovis' performance; 3) Richway's non-performance; and 4) resulting damages.
As framed on summary judgment, Glovis' breach of contract claim is as follows: The lease is a valid contract binding Glovis and Richway. Based on the terms of the lease, Glovis performed by purchasing 12 trailers for Richway's use. Richway's obligation to perform was to make monthly lease payments to Glovis for those trailers, commencing in June 2016 and thereafter, based on the delivery date schedule set by Glovis. Starting in February 2018, Richway failed to make those payments and so breached the lease. Glovis' alleged damages consist of the indebtedness of Richway (failure to pay the amounts due and owing to Glovis under the lease). Per Glovis, Richway owes $372,555.50.
Richway's defense to Glovis' contractual claim is that any alleged amounts owed by Richway to Glovis under the lease were deducted from Glovis' outstanding payables owed to Richway under the separate rail/trucking services agreement. (Doc. 69 at 3-5). Thus, Richway is not in default. Richway contends that there is no provision in the Richway-Glovis lease which prohibits Richway from taking a setoff as "its common law right[ ]" or evinces Richway's "voluntary relinquishment of its known common law right to setoff[,]" and that Richway did not waive such right. (Doc.92 at 9).
a. Set-off
The Glovis-Richway lease provides as follows for Glovis:
(Doc. 102-1 at 63). There is no similar clause for Richway. Rather, Richway asserts it has a right to set-off under federal common law, Section 6-8-80 of the Ala. Code and based on a course of dealing.
First, Richway cites no authority, nor has any been found by the undersigned, that federal common law of contracts is applicable to Glovis' state law breach of contract claim brought in federal court pursuant to diversity of citizenship. It is presumed that Richway's attempt to rely on federal common law is because it appears that there is no common law right to set-off under Alabama law. Rather, set-off is a solely a statutory right.
Second, the Alabama statutory right to set-off (on which Richway relies) is limited to claims reduced to judgments. Specifically, Section 6-8-80 of the
Moreover, while Richway is correct that set-off is "a fundamental right of any creditor," the right is asserted as a counterclaim, not as a defense.
Thus, because Alabama statutory law (at least that cited by Richway) limits set-off rights to claims reduced to judgment, Richway's assertion is premature.
Third, Richway claims an entitlement to setoff based on a history and prior dealings with Glovis — "course of dealing" per
On summary judgment Richway references Glovis' set off of Richway's payables in August 2016. Meeting minutes indicate that on August 1, 2016, Richway (Richardson) and Glovis (Kim and Garvin) met to discuss the payment process for Glovis leasing the 12 trailers to Richway (from Glovis' perspective). (Doc. 102-1 at 81-82 (Meeting Minutes). The minutes state that Richway agreed that Glovis has the right to deduct or write-off any monthly lease receivables from payables for Richway (for Transportation services). As noted supra, the Glovis-Richway lease expressly provides that Glovis may specifically write off or deduct any payables from Richway. So, Glovis' action in this regard appears to be an invocation and application of the Glovis-Richway lease write-off provision, not an extra-contractual act (course of dealing). The only other evidence Richway cites is Glovis' setoff on June 14, 2018 for Richway's rail invoices to clear the January 2018 lease payment due for the trailers (that Glovis credited Richway for a lease payment in lieu of paying Richway's bill for those rail services). (Doc. 92 at 22-23). Again, this is simply Glovis' invocation and application of its contractual right to set-off. Richway can not rely on invocation of a contractual right to establish prior course of dealing.
Based on the foregoing, the Court finds that Glovis has established the absence of genuine issues of material fact for the following: 1) the lease is a valid contract binding Glovis and Richway; 2), Glovis performed by purchasing 12 trailers for Richway's use; 3) Richway's obligation to perform was to make monthly lease payments to Glovis for those trailers, but in January 2018, stopped making those payments and breached the lease; and 4) Glovis was damaged by Richway's failure to pay the amounts owed under the lease. Accordingly, the Court finds as a matter of law that Richway breached the contract such that Glovis' motion for summary judgment on this claim, as to Richway's contractual liability, is
b. Damages
Glovis also seeks summary judgment on the amount of damages, excluding attorneys' fees. Based on the (4) year Glovis-Richway lease, Glovis arranged to pay Transcraft $451,436.32 for the 12 trailers, starting in June 2016 and ending in June 2020. Per the lease, Richway agreed to pay Glovis $10,930/month for 48 months. Glovis also paid $24,920.64 in state taxes. Richway began making payments in June 2016, but stopped in January 2018. In June 2018, the buy-out amount for the lease was approximately $360,000 for Richway, and Glovis agreed to one month's payment being set off. Per Glovis, Richway has only paid $172,904.64 through payments from Richway or set-off by Glovis. Glovis seeks to recover $372,555.50 from Richway, for all past due/remaining rental payments (January 2018 to December 2020) plus pre/post judgment interest. (Doc. 58 at 4).
In response, Richway disputes that it owes any sums to Glovis based on its set-off contentions, and moreover, that any taxes charged by Glovis were improperly assessed and attorney fees are not owed. As to set-off, Richway submits the set-off sum as specified in its counterclaim against Glovis, through which Richway contends Glovis owes $226,833.32 (related to the rail services agreement) plus $381,701.33 (related to the trucking services agreement). (Doc. 92 at 17). Based on the dispute regarding set-off (neither Glovis nor Richway moved for summary judgment on Richway's counterclaim), the issue of damages is carried to trial. With the exception of the following determinations as a matter of law as to taxes, Glovis' motion for summary judgment as to the amount of breach of contract damages is
3. Attorneys' Fees
Glovis claims entitlement to attorneys' fees under the terms of the lease, specifically the Indemnity paragraph contained therein. (Doc. 88). Richway moves for summary judgment on Glovis' claim for attorneys' fees, arguing that the lease agreement does not provide for attorneys' fees. Richway is correct.
As noted by the Eleventh Circuit in
Glovis relies on the lease's indemnity paragraph, which provides: "Lessee shall indemnify Lessor against, and hold Lessor harmless from, any and all claims, actions, suits, proceedings, costs, expenses, damages and liabilities, including reasonable attorney's fees and costs, arising out of, connected with, or resulting from Lessee's use of the Equipment, including without limitation the manufacture, selection, delivery, possession, use, operation, or return of the Equipment." (Doc. 102-1 at 64). Despite Glovis' characterization, the clear and unambiguous indemnity paragraph provides for indemnification as to third-party liability/claims, not as applied to any claims between the contracting parties to the agreement (Glovis and Richway). As explained in
Moreover, while Glovis references a trucking services agreement and an attorneys' fee clause within same, (Doc. 101 at 5-6), Glovis has failed to show how the trucking services contract is relevant to any ability to recover such fees under the Glovis-Richway lease. Glovis has not alleged that Richway breached the trucking services agreement. Thus, Glovis has shown no entitlement to attorneys' fees based on Richway's breach of the Glovis-Richway lease. Richway's motion as to Glovis claim for attorneys' fees is
4. Taxes
Richway first contends that Glovis cannot raise a claim for sales tax paid for the first time on summary judgment. However, Glovis' claim for taxes is part of the damages tied to its breach of contract claim against Richway. Such claim for damages is not a separate count/claim. Thus, Richway's objection is without merit.
Richway next contends that Glovis did not purchase the trailers, that the arrangement was not a lease and thus Glovis was not allowed to charge Richway taxes. In short, Richway disagrees that Glovis' tax payments were correct based on the arrangement Richway contends existed (i.e. a finance agreement as opposed to a lease agreement).
First, Richway's contention that the agreement was not a lease agreement for which sales tax was owed is contradicted by the written contract. The contract indicates the arrangement is an equipment lease, with the equipment not to be returned at the expiration of the contract.
Likewise, sales tax was included on invoices issued but not paid (February 2018 through April 2020). Despite the fact that Richway ceased making payments under the lease in January 2018, Glovis has continued to remit sales tax payments to the requisite taxing authorities. It is these taxes that Glovis seeks to recover as part of their breach of contract damages. Glovis contends that it relied on guidance from the Alabama Department of Revenue in charging sales tax on the lease.
Richway contends that Glovis' reliance on guidance from the Alabama Department of Revenue is misplaced because Glovis did not provide the correct information to the Alabama Department of Revenue. Richway misses the point. The contract clearly provides that Richway owes
B. Richway and RAEL's Partial MSJ: Conversion and Fraud
At the outset, Richway and RAEL's partial motion for summary judgment is premised on inaccurate, yet claimed, "undisputed facts" surrounding the Glovis-Richway lease, including: that the lease was a capital lease, that Glovis entered into any lease to finance both defendants' purchase as 12 trailers, that Glovis intended to finance Richway and RAEL's purchase of the trailers, that Glovis had "full knowledge" of Richway and RAEL's actions, that "[n]o evidence exists so much as even implying that Defendants withheld any information or engaged in conduct subversive to open and honest dealing[,]" and more. (Doc. 102 at 1-2). These are clearly disputed facts, and moreover, facts for which there is evidentiary support favoring Glovis — i.e., a jury could find in Glovis' favor on these issues.
1. Conversion
In Count IV of the Amended Complaint, Glovis alleges a conversion claim against Richway and RAEL. (Doc. 58 at 6-7). Glovis specifically alleges the following: 1) RAEL wrongfully applied for and was granted title to the equipment, wrongfully claims ownership of the equipment, wrongfully took possession of title to the equipment even though Glovis paid for it and only leased it to Richway, wrongfully exercised domain and control over the equipment, wrongfully refused to pay Glovis the cost of the property, and acted in concert with Richway to convert Glovis' property for its benefit; 2) Richway wrongfully claims the equipment is owned by RAEL, wrongfully exercised domain and control over the equipment, wrongfully refused to pay Glovis the amounts due under the lease and/or the cost of the property, and acted in concert with RAEL to convert Glovis' property for its benefit. (
In response, per Defendants: "(1) the subject property never belonged to Glovis; (2) Glovis had no possessory rights with respect to the subject property; and (3) Defendants did not engage in any wrongful or illegal acts with respect to their ownership, possession, and/or control of the trailers." (Doc. 102 at 13).
On summary judgment, Defendants argue that Glovis' conversion claim fails because essential elements for said cause of action do not exist. The Court disagrees. "To constitute conversion, there must be a wrongful taking or a wrongful detention or interference, or an illegal assumption of ownership, or an illegal use or misuse."
2. Fraud
In Count V of the Amended Complaint, Glovis alleges fraud as follows: 1) RAEL represented to Glovis that it owned and had title to the equipment; 2) RAEL falsely represented its ownership of the equipment when it applied for title and when it represented to Glovis that it was the owner; 3) Defendants acted in concert to conceal their actions of taking title/ownership of Glovis' property for their own benefit; 4) because RAEL did not pay for the equipment it knew or should have known it was falsely representing its ownership when it applied for title and when it represented to Glovis that it was the owner; 5) Glovis relied on Richway's representations in the lease agreement as to payment for the equipment; 6) Glovis would not have purchased the equipment for use by Richway had it known RAEL would wrongfully take title; and 7) due to the misrepresentations, Glovis is unable to obtain title to the equipment and cannot recover the equipment or its value. (Doc. 58 at 8-9).
Glovis explains its fraud claim further on summary judgment: "based upon the duties and obligations as set forth in the Lease Agreement . . . the parties had agreed that Glovis was the owner and title holder to the equipment . . . Defendants' ignoring the Lease Agreement to title the equipment in the wrong name all the while placating Glovis that Defendants would correct the title issues. Indeed, it now appears that Defendants never had any intention of fulfilling the terms of the Lease Agreement and defrauded Glovis into funding Defendants use of the equipment." (Doc. 106 at 12).
Defendants argue that the two-year statute of limitations bars Glovis' fraud claims. Specifically, that while Glovis initiated this action in state court on November 12, 2018, it did not allege fraud until July 25, 2019 via filing an amended complaint and thus, is outside of Alabama's statute of limitations governing fraud because Glovis knew or should have known about the surrounding fraud facts in 2016.
Fraud claims in Alabama are subject to a two-year statute of limitations,
In support of their statute of limitations argument, Defendants reference documentation which they assert establishes RAEL's ownership of the trailers, and from that, claim that those documents placed Glovis on notice of the facts of the fraud alleged to start the statute running. Defendants' documentation (7/13/16 MSO certificate email and 9/27/16 MSO certificates), indicate that they placed Glovis on notice that the trailers had been registered/titled in the name of RAEL, not Glovis.
These documents were provided to Glovis; however, the July 2016 "notice of fraud" is disputable. At best, these documents constitute facts or circumstances which may have prompted Glovis to question the registration/titling of the trailers in RAEL's name as of 7/13/16 and/or 9/27/16, instead of its own.
Glovis' explanation is as follows: "Glovis was not aware of the significance of the MSOs and had no reason to believe that Defendants would seek to improperly title the equipment in RAEL's name — particularly since the Lease Agreement prohibited such action." (Doc. 106 at 13). The evidence, in a light most favorable to Glovis, indicates that Glovis first realized the title error in March 2017 and requested that Defendants correct the title to reflect ownership in Glovis' name. Glovis contends Richway led them to believe the error would be corrected. Glovis continued to make this request through October 2017. It was not until January 2018, when Richway ceased making payments, that Glovis realized it had been defrauded. The Court finds that there is an issue of fact for trial as to whether there were sufficient facts, prior to July 2017, to have alerted a reasonable person to the existence of a potential fraud.
Defendants also assert there is no fraud "because it has not identified a single false representation made by Defendants. Moreover, while Glovis' pleading alleges reliance on representations made by Defendants, such representations were true, and Glovis' alleged reliance was neither reasonable nor give rise to damages." (Doc. 102 at 13).
Glovis appears to allege two (2) types of fraud: fraudulent misrepresentation and fraudulent concealment. In Alabama, "[m]isrepresentations of a material fact made willfully to deceive, or recklessly without knowledge, and acted on by the opposite party, or if made by mistake and innocently and acted on by the opposite party, constitute legal fraud."
To recover for fraudulent concealment, Glovis must establish that: 1) the defendant had a duty to disclose a material fact; 2) that the defendant either failed to disclose or concealed that material fact; 3) that the defendant's failure to disclose or its concealment of that material fact induced the plaintiff to act or to refrain from acting; and 4) that the plaintiff suffered damage as a result of its action, or inaction, induced by the defendant's failure to disclose or its concealment of the material fact.
A plaintiff's purported reliance in an action alleging misrepresentation or suppression must be reasonable: `"[T]he right of reliance comes with a concomitant duty on the part of the plaintiffs to exercise some measure of precaution to safeguard their interests. In order to recover for misrepresentation, the plaintiffs' reliance must, therefore, have been reasonable under the circumstances.'"
The Court finds that Glovis has presented sufficient evidence to withstand summary judgment on its fraud claim. Accordingly, Richway's motion is
V. Conclusion
It is