OPINION
HULL, J.
This case involves the California Environmental Quality Act (CEQA; Pub. Resources Code, § 21000 et seq.; unless otherwise set forth, statutory references that follow are to the Public Resources Code) and CEQA "Guidelines" (Cal. Code Regs., tit. 14, § 15000 et seq.), which are entitled to great weight. (In re Bay-Delta etc. (2008) 43 Cal.4th 1143, 1163, fn. 7 [77 Cal.Rptr.3d 578, 184 P.3d 709] (Bay-Delta).)
California's Department of Food and Agriculture (CDFA) prepared and certified a programmatic environmental impact report (EIR) for a seven-year
These two appeals challenge judgments entered after the trial court denied two petitions for writ of administrative mandamus (Code Civ. Proc., § 1094.5) asserting CEQA violations and challenging the program approved by CDFA and its former secretary, A.G. Kawamura. On our own motion, we ordered the appeals consolidated for purposes of oral argument and decision.
One group of appellants (case No. C072067) is comprised of North Coast Rivers Alliance, Stop the Spray Marin, California Alliance to Stop the Spray, Frank Egger, Whitney Merchant, Loralie Cioffi, Helen Kozoriz, Gayle McLaughlin, Robert Lieber, Tony Madrigal, Larry Bragman, Paulina Borsook, Sharon Luehs, Mike De Lay and Janice De Lay (collectively NCRA). They name as real parties in interest Aberdeen Road Company, Pacific Biocontrol Corporation, and ISCA Technologies Incorporated.
The other group of appellants (case No. C072617) is comprised of Our Children's Earth Foundation, Mothers of Marin Against the Spray, Stop the Spray East Bay, City of Albany, City of Berkeley, City of Richmond, City and County of San Francisco, Center for Environmental Health, Californians for Pesticide Reform, Pesticide Watch, Pesticide Action Network North America, Citizens for East Shore Parks, and Stop the Spray San Francisco (collectively OCEF).
Appellants contend the EIR violated CEQA by making assumptions unsupported by substantial evidence and by inadequately addressing environmental impacts, a reasonable range of alternatives, and cumulative impacts. Appellants also contend CDFA's "last-minute" approval of a control program instead of the eradication program rendered the environmental review deficient in failing to provide an accurate and stable project description, inadequately discussing alternatives, and improperly "segmenting" the project by reviewing a seven-year program but approving a seven-year program that will have to continue beyond seven years.
We conclude that, even before the new information came to light that eradication was no longer attainable, the EIR violated CEQA by giving the project's "objective" an artificially narrow definition ("eradication of LBAMs") and thereby omitting analysis of pest control as a reasonable alternative to the eradication program. The EIR acknowledged the project's "purposes" included protecting California native plants and agricultural crops from damage. While a control program may have achieved these "purposes" to some extent (as evidenced by the ultimate approval of a control program), the EIR declined to evaluate a control program as an alternative to an eradication program on the ground that a control program would not achieve the "objective" of eradication. The EIR did not even address in its cumulative impacts discussion the incremental effect of the reasonably foreseeable future need to continue anti-LBAM measures after expiration of the seven-year period. The EIR's omissions leave the record devoid of evidence to prove CDFA's claim that the last-minute change was legally acceptable because the adopted control program was narrower than the EIR's eradication program.
Our finding of CEQA violations as to some issues does not relieve us from reviewing appellants' other contentions. (§ 21005, subd. (c) [any court that finds a CEQA violation "shall specifically address each of the alleged grounds for noncompliance"]; but see Communities for a Better Environment v. City of Richmond (2010) 184 Cal.App.4th 70, 101-102 [108 Cal.Rptr.3d 478] [§ 21005 does not require appellate court to address additional alleged defects that may be addressed in a completely different and more comprehensive manner upon subsequent CEQA review following remand].)
We reverse the judgments and remand with directions.
FACTS AND PROCEEDINGS
The LBAM is an invasive moth native to Australia. Though appellants view LBAM as "innocuous," the record contains evidence supporting a contrary conclusion. The LBAM is a leaf roller that makes a nest by rolling up plant leaves. The larvae feed on leaves and buds, reducing the plant's photosynthetic ability and deforming its growth patterns. LBAM is polyphagous, meaning it eats a variety of plants and trees. The larvae can feed
The first LBAM reported in California was in Berkeley in February 2007. CDFA initiated a pheromone-baited trapping project, found additional LBAM in other counties, and in April 2007 quarantined 182 square miles in Alameda, Contra Costa, San Francisco, Marin, and Santa Clara counties. In May 2007, the United States Department of Agriculture (USDA) issued a federal quarantine order requiring trapping, inspection, and certification of all nursery stock and host commodities in eight California counties.
The USDA Animal and Plant Health Inspection Service (APHIS) convened a technical working group (TWG) of experts from California, Australia, and New Zealand to develop a plan to combat the pest. Although no one had ever succeeded in completely eradicating the LBAM (because the insect was either native to the country or deeply embedded after a number of years), the TWG determined complete eradication was possible in California due to the relatively small LBAM population in California at that time.
The Legislature in September 2007 enacted emergency legislation creating and funding a temporary Light Brown Apple Moth Program in the CDFA, authorizing CDFA to take action until January 1, 2010, to combat the spread of the LBAM. (Food & Agr. Code, former §§ 6050, 6050.1; Stats. 2007, ch. 190, repealed by own terms on Jan. 1, 2010.) The Legislature found in former section 6050 that "[i]ntroduction of the light brown apple moth represents a clear, present, significant, and imminent danger to California's natural environment and agricultural industry. This is an insect species that feeds on over 250 species of native and ornamental plants, fruits, and vegetables. [¶] ... [It also] will feed on alder, ceanothus, columbine, cottonwood, cypress, ferns, fir, hawthorn, honeysuckle, lupine, madrone, oak, pine, poplar, redwood, spruce, and willow." (Former § 6050, subds. (a), (b); Stats. 2007, ch. 190, § 2, p. 2477.) "There is an imminent threat for adverse effect and ultimate extinction to some of these sensitive species if this pest becomes permanently established in California." (Former § 6050, subd. (c).) At that time, LBAM was "currently found in the urban and natural areas in all parts of nine California counties and could move into agricultural croplands." (Id., subd. (e).) The state has a "great interest in protecting its native species and agricultural products from further harm caused by [LBAM]." (Id., subd. (d).) The legislation required CDFA's secretary to provide support staff and logistical support "for eradicating the [LBAM]." (Former § 6050.1, subd. (b); Stats. 2007, ch. 190, § 2, p. 2477.) CDFA was required to "annually review the progress made by each local agency in eradicating the [LBAM], and
In late 2007, CDFA and USDA started emergency treatment of isolated LBAM populations.
The LBAM nevertheless spread rapidly. The numbers of LBAM trapped by CDFA were 10,285 in 2007; 62,346 in 2008; and 71,867 as of March 2009. By 2009, the quarantine area had expanded to 13 counties in California.
In February 2008, CDFA filed a CEQA notice of preparation of a "Programmatic [EIR] (PEIR) for the eradication of the [LBAM]."
The draft EIR (DEIR) which was released for public review at the end of July 2009, stated the "goal" was to eradicate LBAM from California by 2015 (later reset at 2017). "The CDFA's objective is to eradicate LBAM from the state of California by 2015. Initial efforts will be to contain the LBAM population and not allow LBAM to spread into adjacent counties. The CDFA will then suppress heavily infested areas around production nurseries, suppress and eradicate populations in outlying counties to remove these counties from regulation, and finally eradicate populations throughout the state. Eradication is to be accomplished using a variety of tools with reliance primarily on biological control methods applied in an effective and environmentally safe manner. [¶] The Program is needed to protect the state's native plants, forest species, agronomically important crops, and ornamental plants from damage by this invasive pest species. The CDFA must protect agriculture from invasive pests to protect the nation's food supply, the environment, and the economy. Furthermore, eradication of the pest within the state is needed to prevent its expansion to other states and other countries."
The DEIR's chapter on alternatives reveals a failure to appreciate CEQA's requirement to study alternatives to the program. (§§ 21001, subd. (g), 21100, subd. (b)(4); Guidelines, § 15126.6.) It studied as "alternatives" seven tools (five of which were approved) to be used in whatever combination was best suited for particular sites to be treated. The DEIR said: "This chapter summarizes the analysis of alternatives for LBAM eradication. It presents a series of potential alternatives or `tools' and screening criteria to produce a `toolbox' of options to support the LBAM Eradication Program." (Italics added.)
The five approved tools mislabeled as "alternatives" were
(1) Sterile insect technique (SIT), releasing sterile moths into the environment to mate with wild moths;
(3) Mating disruption pheromone applied using ground-based equipment (MD-2), applying LBAM pheromones to trees and shrubs in residential yards and to telephone poles and trees on public property along roadways;
(4) Inundative parasite wasp release (Bio-P) releasing an egg parasitoid, which is a native stingless wasp — a predator to the moths — near foliage where LBAM have been detected; and
(5) Foliar ground treatments with approved insecticides (Btk and S). Btk is the biopesticide Bacillus thuringiensis kurstaki, a live bacterium that invades the host organism. "S" is the chemical pesticide Spinosad.
DEIR's appendix H — "Process Used to Select Tools for Use in the [LBAM] Eradication Program" by LBAM eradication program director Robert Dowell dated April 5, 2009 — stated: "The goal of the [LBAM] Eradication Program is the elimination of breeding populations of the moth from California. This is fundamentally different [from] controlling the pest. In control programs the goal is to protect a specified area such as a crop from the damage caused by the moth. Only a portion of the pest population is treated; that which threatens the area to be protected. The control measures are applied to the area to be protected and it is assumed that some damage is acceptable. Control measures are generally not applied outside the area to be protected. Thus, if an exotic pest becomes permanently established in California, control measures will be needed forever. [¶] Eradication programs treat the entire pest population with the goal of eliminating it. If successful, the pest is gone and additional, permanent control measures are no longer needed. [¶] LBAM has never been the target of a previous eradication program. Therefore there are no successful model programs for this program to follow. In these circumstances [CDFA] and [USDA] have relied on the use of successful control measures to eradicate the pest. The difference is that instead of simply lowering the pest population in a selected portion of its population (control) we treat the entire population to elimination (eradication). [¶] The CDFA used a step-wise process to evaluate a number of potential tools for use in the LBAM Eradication Program. The process involved an initial screen to determine which tools merited further evaluation and then a second evaluation to determine which tools will actually be used in the program.... This information was used to select the tools to be evaluated further for use in the eradication program." (Italics added.)
However, the DEIR also spoke of an apparently different integrated pest management (IPM) strategy, characterized as a "control" strategy that was therefore "not evaluated further in the process to determine which tools would be used in the LBAM Eradication Program. IPM as an approach to pest eradication provides the framework in which individual tools were evaluated."
The DEIR discussed a "No-Program Alternative" (NPA), whereby ongoing activities of quarantine, detection, and inspection would continue, but without application of the tools. Restrictions on domestic and foreign trade would increase. The DEIR anticipated that, absent eradication, crops would be damaged and Californians would increase private use of pesticides to control LBAM in yards and agricultural areas.
CDFA held public meetings and received numerous comments from the public.
On February 26, 2010, CDFA published the final EIR (FEIR). The FEIR noted it had received comments that some experts opined eradication may not be feasible, but CDFA was going to follow its own experts who opined the available tools should be sufficient to accomplish the goal of eradication. (Guidelines, § 15151 ["Disagreement among experts does not make an EIR inadequate, but the EIR should summarize the main points of disagreement among the experts."].)
The FEIR stated: "The difference between control and eradication does not lie in the tools used but rather in the scope and intensity with which the tools are used, as explained below:
"... In control programs the goal is to lower pest numbers below the economic injury level in the crop areas. In control programs it is assumed that the growers can tolerate some damage and that the pest will never be eliminated from the area. The tools are applied only as long as necessary to lower pest numbers, and they are applied only to the crop to be protected. Pest populations outside the croplands are not treated.
"... Eradication uses the same tools but in a different fashion. In eradication programs, the tools are applied to the entire pest population, not just part of it, and the tools are consistently applied until the pest is entirely
"Eradicating a population of an exotic pest from California does not mean the pest cannot reinvade the state. The Program has stated that it will conduct an annual review each December of its progress and evaluate whether the goal of eradication still appears to be attainable (CDFA Report to Legislature 2008). The latest available review was conducted in December 2008." (Italics added.)
The public comments complained the DEIR did not analyze a reasonable range of alternatives to the program, including an IPM control program, classic biological control, removing quarantine restrictions, and monitoring.
The FEIR responded IPM is "not a tool but an approach to controlling pests.... `[It] first assesses the pest situation, evaluates the merits of pest management options and then implements a system of complementary management actions within a defined area. The goal of IPM is to mitigate pest damage while protecting human health, the environment and economic viability.' The components of an IPM program include setting action thresholds, monitoring and detection, proper identification, and action/implementation .... The tools used in an IPM program include biological control, cultural controls such as clean culture and habitat manipulation, chemical controls (including insect pheromones, pesticides, and biologically produced toxins), and genetic control with resistant plants and quarantines (University of California IPM Program 2008; Ciborowski 2007).
"All CDFA insect eradication programs represent an integrated approach in which action thresholds are set, detection and monitoring programs are established, target organisms are properly identified, available tools are identified and evaluated for their effectiveness and environmental impacts, and the program is then implemented. For LBAM, the action threshold has changed from the detection of a single moth to the detection of two or more moths within 3 miles of each other within a time period equal to a single lifecycle. Detection and monitoring is done using over 40,000 traps statewide baited with LBAM pheromone. Suspect LBAMs are sent to a CDFA expert for identification. The first LBAM detected in each county is sent to USDA Systematic Entomology Laboratory for confirmation. Like IPM programs, the
"The main difference between classical IPM and CDFA eradication programs is the desired endpoint. For IPM programs, the goal is to use one or more control measures to lower the pest populations within the defined area below economically damaging levels. It is assumed that some damage can be tolerated and that these measures will be needed into the foreseeable future. For CDFA eradication programs, the goal is the elimination of the pest so that control measures will not be needed at all. It is notable, though, that the Program includes components, such as organically approved insecticides and SIT, which many laypeople identify as `IPM' techniques. While the identification of these components as `IPM' is not technically correct, the Program components do contain environmentally sensitive, species-specific features that many people mistakenly identify as `IPM.'"
In response to public comments about alternatives of removing quarantine restrictions and monitoring, the FEIR responded, "neither are measures to physically control LBAM populations. Rather, it simply provides some relief from the economic harm that will be suffered by growers who would not be able to market their products due to the quarantines." The response further stated that reclassification to remove quarantines would allow for a greater rate of spread; USDA was evaluating a petition for reclassification; reclassification is outside the scope of CDFA's authority; and "[b]ased on the information available to CDFA regarding the potential threat to the environment (including California's native plants) and economy from LBAM, CDFA does not consider reclassification a feasible alternative." The response added that the current trapping program was monitoring LBAM spread; the county agricultural commissioners were monitoring for damage caused by leaf rollers and requesting identification of larvae to determine if the damage was caused by LBAM. "Because monitoring will not accomplish the Program objective of eliminating the threats to the economy and the environment posed by LBAM, CDFA does not consider it a feasible alternative."
On March 12, 2010, CDFA received advance notice of a new release issued by USDA's APHIS three days later, stating eradication of LBAM was no longer feasible: "[S]ince the pest was detected, LBAM has spread to such an extent in California that eradication in the state is not feasible until new tools, such as sterile insect technology [SIT], are fully developed and ready for widespread use in concern with currently available methods. Therefore, APHIS is shifting to a control and suppression strategy and will maintain its survey and regulatory framework, including enforcement of phytosanitary measures, to ensure that LBAM is not spread to other states or trading partners."
CDFA's findings stated, under a heading of "Other Alternatives Analyzed, Considered and Rejected" that "`Integrated Pest Management (IPM) is an approach which first assesses the pest situation, evaluates the merits of pest management options and then implements a system of complementary management actions within a defined area. The goal of IPM is to mitigate pest damage while protecting human health, the environment and economic viability.' The components of an IPM program include setting action thresholds, monitoring and detection, proper identification, and action/implementation [citation]. Classical IPM programs may include biological control, cultural controls such as clean culture and habitat manipulation, chemical controls (including insect pheromones, pesticides, and biologically produced toxins), and genetic control with resistant plants and quarantines [citation]. [¶] The Program incorporates many of these features in that it includes an integrated approach in which action thresholds are set, detection and monitoring programs are established, target organisms are properly identified, available tools are identified and evaluated for their effectiveness and environmental impacts, and the program is then implemented. However, for IPM programs, in contrast to the proposed Program, control measures are used to lower the pest populations within the defined area below economically damaging levels. For IPM programs, [it] is assumed that some damage can be tolerated and that these measures will be needed into the foreseeable future. [¶] These features of IPM are inconsistent with
This foregoing passage in the findings included a footnote that "As noted in Master Response C in the Final EIR, the elements of a classical IPM program include biological control and use of insect pheromones and pesticides. Likewise, the alternatives evaluated for potential implementation under the Program include elements of biological control (... Bio-P), use of insect pheromones (... MD-1, MD-2, MD-3 and MMA), and use of pesticides (... Btk and S). This overlap caused many members of the public to be confused about whether the Program is an IPM program. The Program is not an IPM program because the Program aims to use available tools to eradicate LBAM populations where it is feasible to do so. However, the Program's ... tools do include environmentally sensitive, species-specific features that many lay people mistakenly identify as `IPM.'"
CDFA rejected the NPA because LBAM populations would spread. Absent a CDFA-led effort to contain, control, and suppress LBAM, the existing quarantine, detection, and inspection activities mandated by regulations of CDFA, Canada, and Mexico — which are part of the environmental baseline — would be continued, and restrictions on domestic and foreign trade would increase as LBAM populations increased. Without a coordinated control program, a 5 to 20 percent crop yield loss would be expected based on New Zealand's experience. Spread of the pest could impact grapes, citrus, peaches, plums, cherries, apricots, as well as trees such as pine, cypress, and oak. If LBAM caused extensive damage to plants, it may have adverse impacts on sensitive animals dependent on those plants for breeding, feeding, or shelter. Almost every type of ornamental plant would be in danger of being damaged by LBAM larvae. Given the risk of damage, it was "highly likely" that private individuals (residential and commercial) would use insecticides to control LBAM.
CDFA concluded potential adverse impacts associated with the program could be mitigated to a less-than-significant level through implementation of
CDFA's findings declared the program's objectives to be to "protect the nation's food supply, and protect and promote California's agricultural economy and the environment by keeping LBAM from attaining damaging levels; [¶] ... contain, control and suppress LBAM in areas where current LBAM population densities and the extent of the contiguous spread of the pest make eradication infeasible at this time; [¶] ... eradicate small, discrete LBAM populations within California; [¶] ... [¶] ... protect California's natural resources ... from environmental damage by LBAM; [¶] ... protect the larger environment by preventing the expansion of LBAM to other states and areas; and [¶] ... avoid the expense, environmental risks, and administrative difficulties of implementing permanent quarantines and an agricultural inspection program to address persistent LBAM populations statewide."
Appellants filed their petitions for writ of administrative mandamus. The two petitions were argued together, and the trial court issued a detailed decision denying the petitions and entered judgments.
DISCUSSION
I
Standard of Review
"`In reviewing an agency's compliance with CEQA in the course of its legislative or quasi-legislative actions, the courts' inquiry "shall extend only to whether there was a prejudicial abuse of discretion." (Pub. Resources Code, § 21168.5 ...; see Western States Petroleum Assn. v. Superior Court [(1955)] 9 Cal.4th [559,] 568 [38 Cal.Rptr.2d 139, 888 P.2d 1268]; Laurel Heights Improvement Assn. v. Regents of University of California (1988) 47 Cal.3d 376, 392-393 [253 Cal.Rptr.3d 426, 764 P.3d 278] (Laurel Heights I).)
"`An appellate court's review of the administrative record for legal error and substantial evidence in a CEQA case, as in other mandamus cases, is the same as the trial court's: The appellate court reviews the agency's action, not the trial court's decision; in that sense appellate judicial review under CEQA is de novo.... We therefore resolve the substantive CEQA issues ... by independently determining whether the administrative record demonstrates any legal error by the [Department] and whether it contains substantial evidence to support the [Department's] factual determinations.' (Vineyard Area Citizens for Responsible Growth, Inc. v. City of Rancho Cordova [(2007)] 40
II
Distinction Between Program EIR and Project EIR
A program EIR has advantages for the public agency, in that it is possible to conduct subsequent activities without preparing a new EIR if the agency finds that no new effects could occur or no new mitigation measures would be required. (Guidelines, § 15168, subd. (c); Center for Biological Diversity, supra, 234 Cal.App.4th at p. 233.)
A program EIR should contain a sufficient degree of analysis, in the light of what is reasonably feasible, to provide decision makers with information that enables them to make a decision which intelligently takes account of environmental consequences. (Center for Biological Diversity, supra, 234 Cal.App.4th at p. 234.) "`The courts have looked not for perfection but for adequacy, completeness, and a good faith effort at full disclosure.'" (Ibid., quoting Guidelines, § 15151.)
III
Last-minute Change
Appellants argue the last-minute change from eradication to control violated CEQA in various ways, such as by rendering the project description unstable and inaccurate, and by improperly "segmenting" the matter by studying a program of limited duration but approving a program of unlimited duration. However, the approved program was of limited duration of seven years.
Here, we cannot accept the assurances of CDFA's attorney at oral argument that a new EIR will be prepared for any activity post-2017. The trial court asked for a stipulation or stipulated order to that effect. CDFA drafted a stipulation that it "hereby confirms that — consistent with paragraph 34 of [its] March 22, 2010 findings of fact [citation to administrative record] and paragraph 6 of [its] March 22, 2010 certification of the certified EIR [citation to administrative record] — the LBAM program approved by [CDFA] on March 22, 2010, will not continue beyond seven (7) years from the date the certified EIR was certified (that is, beyond March 22, 2017), without the Department first undertaking further environmental review under [CEQA]." The referenced paragraph 34 stated, "The risk assessments for the PEIR analyzed the potential impacts associated with implementing the Program for seven years. Since the starting date of the Program will be 2010, the Program could be implemented through 2017 within the scope of the analysis of the risk assessments." The referenced paragraph 6 stated, "Should CDFA wish to continue implementing the Program's alternative tools beyond the seven-year period analyzed in the existing risk assessments, additional CEQA review may be required." (Italics added.)
Appellants opposed the proposed stipulation. Despite CDFA's equivocation, the trial court stated in its written ruling on the merits that additional review after seven years is required by CDFA's confirmation of the seven-year duration of the approval.
CDFA continues to equivocate on appeal. Its appellate brief states, "if in 2017 CDFA determines the LBAM Program is still needed for the protection of the state's economy and environment, CDFA will conduct additional environmental review under CEQA prior to continuing with the LBAM Program." Notably, CDFA does not say such additional environmental review would take the form of a new EIR. Additional review could mean CDFA considers whether a new EIR is needed and decides no. This is apparent in CDFA's further statement in its appellate brief, that it "represented that at the end of seven years, it would re-evaluate the need for continued action and any further environmental review."
IV
EIR Failed to Address Reasonable Range of Alternatives
Appellants complain the EIR violated CEQA by failing to consider a reasonable range of alternatives in the DEIR, particularly a control program as an alternative to an eradication program, and CDFA violated CEQA by failing to reconsider alternatives after its last-minute change from an eradication program to a control program. We conclude that, even before the last-minute change, the EIR was fatally defective in failing to analyze a control program as a reasonable alternative to an eradication program.
A. CEQA Law Regarding Alternatives
The Legislature has declared it the policy of the state to "[r]equire governmental agencies at all levels ... to consider alternatives to proposed actions affecting the environment." (§ 21001, subd. (g).) "The Legislature finds and declares that it is the policy of the state that public agencies should not approve projects as proposed if there are feasible alternatives or feasible mitigation measures available which would substantially lessen the significant environmental effects of such projects, and that the procedures required by this division are intended to assist public agencies in systematically identifying both the significant effects of proposed projects and the feasible alternatives or feasible mitigation measures which will avoid or substantially lessen such significant effects. The Legislature further finds and declares that in the event specific economic, social, or other conditions make infeasible such project alternatives or such mitigation measures, individual projects may be approved in spite of one or more significant effects thereof." (§ 21002; see also Bay-Delta, supra, 43 Cal.4th at p. 1169.)
The Guidelines provide: "An EIR shall describe a range of reasonable alternatives to the project ... which would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen any of the significant effects of the project, and evaluate the comparative merits of the alternatives. An EIR need not consider every conceivable alternative to a project. Rather it must consider a reasonable range of potentially feasible alternatives that will foster informed decisionmaking and public participation.
"The range of alternatives required in an EIR is governed by a `rule of reason' that requires the EIR to set forth only those alternatives necessary to permit a reasoned choice. The alternatives shall be limited to ones that would avoid or substantially lessen any of the significant effects of the project. Of those alternatives, the EIR need examine in detail only the ones that the lead agency determines could feasibly attain most of the basic objectives of the project. The range of feasible alternatives shall be selected and discussed in a manner to foster meaningful public participation and informed decision making." (Guidelines, § 15126.6, subd. (f).)
B. Failure to Consider Control as an Alternative to Eradication
As indicated, the EIR confusingly mislabeled various tools for attacking LBAM as "alternatives" to the program. And the EIR rejected out of hand anything that would not achieve complete eradication of LBAM, e.g., a control program of integrated pest management.
The EIR did not decline to study control as an alternative to eradication on the ground a control program would not lessen the environmental effects. Rather, the EIR declined to evaluate a control program as an alternative on the ground it would not achieve the stated goal of eradication. However, this position confuses the CEQA project, objectives, and purposes.
Thus, the EIR purports to view eradication as the "objective" and protection of crops/plants as the "purpose." However, "`The statement of objectives should include the underlying purpose of the project.'" (Bay-Delta, supra, 43 Cal.4th at p. 1163, quoting Guidelines, § 15124, subd. (b).)
Bay-Delta involved a long-term, comprehensive plan to restore the Bay-Delta's ecological health and improve management of Bay-Delta water for the various beneficial uses that depend on it. (Bay-Delta, supra, 43 Cal.4th at pp. 1151-1152.) The Supreme Court held the failure to examine in detail a program alternative requiring reduced water exports from the Bay-Delta was
Here, in contrast, protection of plants and crops was clearly an objective and the underlying purpose of the eradication program.
Moreover, the goal of eradication was always known to be tenuous, because LBAM kept spreading despite the emergency treatments authorized by the Legislature, spreading to more counties during the DEIR process, and the Legislature required CDFA to monitor LBAM on an annual basis. Additionally, the DEIR's appendix on the process used to select tools acknowledged that "if an exotic pest becomes permanently established in California, control measures will be needed forever."
That defining the objective as eradication was "artificially narrow" is further apparent from the fact that the last-minute change did not describe the revised program objective as simply "to control" LBAM. Rather, CDFA's own findings in approving the control program acknowledge, "As revised, the objectives of the LBAM Program [include]: [¶] ... protect the nation's food supply, and protect and promote California's agricultural economy and the environment by keeping LBAM from attaining damaging levels; [¶] ... [¶] ... protect California's natural resources ... from environmental damage by LBAM; [¶] [and] protect the larger environment by preventing the expansion of LBAM to other states and areas ...." (Italics added.)
A control program should have been studied as an alternative to eradication, particularly given the EIR's acknowledgement that eradication could become unattainable at any time.
It is possible a control program may not be a viable alternative on the ground its unending nature would be more harmful to the environment than an eradication program. On the other hand, it could be that an eradication program would require more intensive application of tools than a control program, leveling out the environmental impacts. We do not know, because CDFA skirted the issue. Had CDFA evaluated a "control" program as an alternative to an "eradication" program, CDFA may have rejected a control program on the ground the unending nature of it would be more harmful to the environment. At least that is the inference to be drawn from the EIR's drumbeat distinguishing the two. But that just goes to show the prejudice of CDFA's last-minute shift from eradication to an unstudied control program.
We conclude the EIR violated CEQA by failing to study control as an alternative to eradication. That error infected the entire EIR insofar as it
C. Prejudice
Section 21005 provides: "(a) The Legislature finds and declares that it is the policy of the state that noncompliance with the information disclosure provisions of this division which precludes relevant information from being presented to the public agency, or noncompliance with substantive requirements of this division, may constitute a prejudicial abuse of discretion within the meaning of Sections 21168 and 21168.5, regardless of whether a different outcome would have resulted if the public agency had complied with those provisions. [¶] (b) It is the intent of the Legislature that, in undertaking judicial review pursuant to Sections 21168 and 21168.5, courts shall continue to follow the established principle that there is no presumption that error is prejudicial. [¶] (c) It is further the intent of the Legislature that any court, which finds, or, in the process of reviewing a previous court finding, finds, that a public agency has taken an action without compliance with this division, shall specifically address each of the alleged grounds for noncompliance."
The burden is on the agency to establish lack of prejudice. (Environmental Protection Information Center v. California Dept. of Forestry & Fire
Here, the prejudice in the EIR's failure to address control as an alternative to eradication is apparent, because the EIR dismissively rejected anything that would not achieve eradication. As we discuss post, this prejudice was compounded because the EIR's cumulative impacts discussion failed to address the reasonably foreseeable need for continued control activities. Accordingly, CDFA's ultimate selection of an alternative (control program) not analyzed in the EIR left the EIR inadequate as failing to include relevant information and precluding informed decisionmaking and informed public participation.
The last-minute change from an eradication program to a control program did not cure the prejudice. Chaparral Greens v. City of Chula Vista (1996) 50 Cal.App.4th 1134 [58 Cal.Rptr.2d 152] (Chaparral Greens) held the failure to revise an EIR based on new information did not violate CEQA, because substantial evidence supported the agency's decision that the new information was insignificant. (Chapparal Greens, at pp. 1147-1148.) Here, the new information was clearly significant, since it caused CDFA to change the program. Although CDFA claims the change reduced the scope of the program, appellants make the plausible argument that the change expanded the scope of the program into one of indefinite duration. The manner in which CDFA conducted the environmental review process — ignoring anything that would not achieve eradication — leaves the record without substantial evidence to support CDFA's claim.
Though not cited by the parties, we discussed the situation where a public agency selected an alternative not analyzed in the EIR based on new information in Western Placer Citizens for an Agricultural & Rural Environment v. County of Placer (2006) 144 Cal.App.4th 890 (Western Placer CARE).)
Here, in contrast, the record does not contain evidence demonstrating the change from eradication to control was insignificant.
CDFA cites case law finding there was no error where the approved project was narrower than the EIR's project description. (E.g., Dusek v. Redevelopment Agency (1985) 173 Cal.App.3d 1029, 1040 [219 Cal.Rptr. 346] [EIR described acquisition and demolition of multiple buildings but agency approved only the demolition of one building].)
However, we cannot tell whether the approved control program was narrower than the EIR's described eradication program, because the EIR expressly declined to evaluate a control program as an alternative to an eradication program. CDFA's findings stated the difference between eradication and control was in the intensity, in that control is less intensive than eradication. CDFA claims the change reduced the scope of the project: "The difference between control and eradication does not lie in the tools used but in the intensity of their use. Control targets a portion of the pest population, while eradication targets the entire pest population. Thus, the PEIR analyzed a more intense Program than CDFA is now proposing to implement. The environmental impacts of the reduced Program will be no greater than — and will almost certainly be less than — the environmental impacts of the more aggressive Program analyzed in the PEIR." (Original italics.) This was supposition on CDFA's part. CDFA does not direct our attention to anything in the record that would constitute substantial evidence supporting this supposition.
Instead, the record supports an opposing inference that a control program may be more harmful to the environment than an eradication, because the EIR acknowledged a control program would need to go on "forever."
We continue on with appellants' other contentions as needed to comply with section 21005, subdivision (c), which requires us to address other contentions despite finding reversible error as to one contention.
V
The "No Program Alternative" (NPA)
A. Substantial Evidence
Appellants argue no substantial evidence supports two assumptions CDFA made about potential impacts of the NPA of doing nothing about LBAM. NCRA claims CDFA merely assumed based on "flawed studies and unsubstantiated claims" that doing nothing would cause (1) a dramatic increase in private pesticide use and (2) crop damage and reduced agricultural revenues. We see no reason to reverse the judgment on this ground.
Substantial evidence includes facts, reasonable assumptions predicated upon facts, and expert opinion supported by facts. (§ 21082.2, subd. (c); Guidelines, § 15384, subd. (b).) It does not include "[a]rgument, speculation, unsubstantiated opinion or narrative, evidence which is clearly inaccurate or erroneous, or evidence of social or economic impacts which do not contribute to, or are not caused by, physical impacts on the environment ...." (§ 21082.2, subd. (c); accord, § 21080, subd. (e)(2).)
1. Crop Damage
Appellants claim there was only one incident of crop damage, which "ultimately proved to be from a different insect." The DEIR acknowledged it used evidence from outside California due to the lack of any published studies of crop damage caused by LBAM in California.
In light of our conclusion that the program cannot continue without further environmental review, we need not address sufficiency of evidence regarding crop damage, because there is doubtless new information on this point since the EIR was certified.
2. Private Use
As to anticipated private pesticide use in the absence of CDFA action, the EIR separately addressed urban and agricultural uses. For private urban use, the EIR relied on studies performed in 2001 through 2003 by University of California scientists Cheryl Wilen and Mary Louise Flint, as analyzed by LBAM eradication program director Robert Dowell in his April 2008 "Calculation of the Potential Increase in Urban Homeowner Pesticide Use Caused by a Generalized [LBAM] Infestation in Coastal California." For private agricultural use, the EIR relied on a University of California report (Johnson et al., Light Brown Apple Moth in California: Quarantine, Management, and Potential Impacts (2007)) and literature from the USDA, Australia, and New Zealand.
Appellants do not always make clear whether they are arguing about urban or agricultural use. They complain the studies showed that most private urban pesticide use targeted ants, and only 3 to 7 percent targeted plant-pests. Appellants claim the existing pesticide use against plant-pests should have been considered part of the environmental baseline, but CDFA instead extrapolated it to project increased pesticide use. However, existing use was considered a baseline. Moreover, that increased pests will mean increased pesticide use is a reasonable assumption.
OCEF maintains no additional spraying would be needed for individuals who already spray for backyard pests, because any current pesticide would likely kill LBAM as well. However, OCEF does not direct our attention to anything in the multiple cited pages that supports this assertion.
OCEF claims, "[t]he point is that CDFA's assumed
OCEF argues the Dowell report "speculated" that private individuals would use the "highly toxic pesticides permethrin or chlorpyrifos," whereas it was not known what people were then using. However, the EIR merely listed chlorpyrifos among the registered products that consumers "may" use and stated it was using permethrin as a "representative material." Though OCEF cites evidence that use of permethrin had decreased from 2002 to 2007, the record contains reports of the U.S. Environmental Protection Agency that individuals used about two million pounds of permethrin annually, over 70 percent of which was used in non-agricultural settings, and 41 percent of which was applied by homeowners in residential areas. CDFA selected permethrin because it is a broad-spectrum pesticide that kills LBAM and is readily available to and commonly used by consumers, and CDFA planned to use it. It was reasonable for CDFA to use permethrin as representative in light of the evidence.
OCEF argues there was no evidence that farmers would increase pesticide use in the absence of a program, because there was no evidence LBAM had caused any crop damage, and the only cited incident of damage was ultimately shown to be from a different insect. OCEF's appellate brief argues LBAM "is primarily located in two counties," so there is no evidence supporting a conclusion of increased pesticide use by farmers. The reference to two counties is perplexing, since LBAM had already spread to 13 counties during the review process.
In any event, we conclude appellants' claims of insufficiency of the evidence do not constitute a separate ground for reversal of the judgment.
B. Asserted Effect of Quarantines on No-program Alternative (NPA)
In 2007, CDFA and USDA established quarantines that required "trapping, inspection, and certification of all nursery stock and host commodities" in eight counties. The quarantines later expanded to 13 counties and were to continue throughout the seven-year program.
OCEF argues the NPA was defective in failing to consider how the quarantines would affect LBAM spread under the NPA. OCEF claims,
However, in this case the record shows LBAM continued to spread throughout California during the environmental review process, despite the quarantines, increasing from 10,000 to more than 71,000 in two years.
We conclude appellants fail to show reversible error regarding the NPA.
VI
Asserted Failure to Analyze Impacts
NCRA argues the EIR failed adequately to analyze impacts on several points, while OCEF makes this argument as to one point (site-specific impacts). We see no need to reverse the judgments on these grounds, though we do not foreclose the possibility that updated evidence may alter the analysis in the event CDFA proceeds with further environmental review in order to continue its control program.
A. Twist Tie Tool (MD-1)
CDFA found using plastic twist ties attached to aluminum wire and infused with LBAM pheromone on trees and shrubs would not result in significant impacts, because they would be used only to address "small isolated infestations," and they do not kill LBAM but disrupt mating behavior, thus diminishing the likelihood of successful reproduction. The pheromone degrades over time. Twist ties are placed by hand and retrieved after three to six months. A search can be conducted if any are missing. A potential exists for ingestion by birds, but the twist ties lack flavor and were not likely to be swallowed. The twist ties are placed six to eight feet off the ground and therefore not likely to be ingested by animals. Toxicity studies of twist ties under federal law (Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), 7 U.S.C. § 136a(c)(5)) and under the California Department of Fish and Game, Pesticide Investigations Unit, indicated they were not harmful except at high doses, which were not expected in this case due to CDFA's commitment to remove the twist ties.
B. Ground Application Tool (MD-2)
NCRA argues the EIR failed adequately to address impacts of MD-2, application of chemical pheromones (Hercon Bio-Flake and SPLAT) to trees and shrubs in residential yards and telephone poles and trees on public property along roads.
NCRA complains the EIR said potential ingestion of significant quantities of Hercon Bio-Flake was extraordinarily small because a "very low number of flakes" would be applied per acre, "approximately 1 cup." NCRA complains the volume of these tiny flakes is a "meaningless statistic" that reveals nothing about the actual number of flakes. NCRA fails to persuade us why this should matter.
C. Aerial Spraying Tool (MD-3)
NCRA argues the EIR inadequately analyzed the MD-3 tool of aerial spraying of Hercon Bio-Flake or SPLAT. However, CDFA findings stated it would not use this tool. We therefore need not consider the contentions on appeal. We disregard the argument in NCRA's reply brief, unsupported by any evidence or authority whatsoever, that maybe CDFA (having found the tool was not feasible "at this time") will change its mind and use the trial court's ruling upholding adequacy of the EIR's discussion of MD-3 as a bar to any future challenge.
D. Organically Approved Insecticide Tools (Btk and S)
NCRA argues the EIR inadequately analyzed the impacts of insecticides Btk and S. on non-target species such as butterflies, bees, and birds. The EIR stated that impacts were considered less than significant due, in part, to the "short-term length of the Program." NCRA argues the last-minute change from eradication to control renders this conclusion defective now that CDFA has approved a program "of indefinite duration." However, CDFA approved only a seven-year program.
NCRA also argues no evidence supports the conclusion that "highly localized" spraying will avoid significant impacts to non-target species, and there was no evidence of how far the spray will drift. However, as CDFA points out, NCRA fails to cite evidence studying drift and has therefore forfeited the contention.
E. Sterile Insect Technique Tool (SIT)
SIT would produce and release millions of sterile moths. NCRA argues the EIR failed to analyze impacts of the reasonably foreseeable accidental release of fertile moths, development of asexually reproducing LBAM, and resistance of LBAM to the radiation rendering them sterile. NCRA cites its own comment letter asserting a sterilization accident occurred in 2003, resulting in the release of fertile flies around a Mexico facility. However, the EIR explained quality control procedures in California were more effective than in Mexico.
NCRA complains CDFA did not disclose the contents of the "emergency plan" it stated it has for dealing with the remote possibility of accidental release during transport. The FEIR referred to "Chapter 6 — Hazardous Materials." CDFA submitted the emergency plan to the trial court with a declaration stating it was inadvertently omitted from the administrative record. To the extent NCRA suggests it was not made available to the public, our reversal renders the point moot.
F. Site-specific Impacts
Appellants argue the EIR is defective because it does not discuss site-specific impacts. We conclude appellants fail to show reversible error on this basis.
The EIR stated site-specific evaluation was beyond the scope of the programmatic evaluation. The EIR identified a number of likely areas that would be subject to program activities, stated it was impossible to determine in advance where all LBAM populations will occur, and promised that prior to deploying treatments CDFA would follow notification procedures to local elected officials, the agricultural commissioner, and affected residents and would hold informational open houses for residents. The FEIR noted the DEIR evaluated the significance of impacts of each tool in various types of land use and topography.
After briefing was completed in this case, we recently held in Center for Biological Diversity, supra, 234 Cal.App.4th 214, that a fish hatchery and stocking enterprise of the Department of Fish and Wildlife was an appropriate project for a program EIR. The center argued the EIR was inadequate because
"In effect, after a sufficiently comprehensive and specific program EIR has been certified, CEQA allows much of the initial site-specific review to occur outside a formal CEQA process and beyond public view. CEQA does not require the Department to engage in a public process when it determines
Before the Department would stock a water body, it would utilize the "evaluation protocol" — a checklist to document site-specific impacts and determine whether they were sufficiently analyzed in the program EIR — to determine if any "decision species" were present. If they were present, the agency would determine whether stocking would have a substantial environmental effect, a review that "will by necessity include application of the impacts analysis contained in the EIR, as well as a determination of any other impacts that may not have been addressed in the EIR. This is exactly the type of process CEQA requires an agency to utilize outside of public review when it intends to approve a site-specific project that is part of a program previously reviewed in a program EIR. If the Department upon using the evaluation protocol discovers an impact that was not sufficiently addressed in the EIR, it will then be obligated to begin a CEQA process, but only if the Department intends to approve the activity." (Center for Biological Diversity, supra, 234 Cal.App.4th at p. 239.)
We conclude appellants fail to show reversible error in the EIR's impacts analysis.
VII
Cumulative Impacts
NCRA argues the EIR's cumulative impacts analysis violated CEQA by failing to address (1) the synergistic effects of the project, and (2) individually minor but collectively significant cumulative impacts. OCEF argues the cumulative impacts analysis violated CEQA by (1) failing to use one of two methods (the list method or the summary-of-projections method) in Guidelines section 15130, subd. (b), and (2) failing to discuss ongoing programs targeting other pests.
Our finding of reversible error (in the EIR's failure to analyze a control program as an alternative to an eradication program) necessarily requires a new cumulative impacts discussion in the event CDFA undertakes the further environmental review needed to proceed with the program.
Here, any revised cumulative impacts discussion will have to include the reasonably foreseeable need to continue anti-LBAM activities after expiration of the seven-year period and into the foreseeable future, as acknowledged in
Moreover, CDFA's own argument in effect acknowledges the current cumulative impacts discussion for a control program will be different from the discussion for the eradication program, because the EIR and CDFA's findings stated a control program and an eradication differ in "intensity." While CDFA claims a control program is less intense, appellants disagree, and the manner in which CDFA has conducted the environmental review leaves the record bereft of evidence to resolve the dispute.
On appeal, CDFA does not try to argue that the program could continue without incremental impacts. Instead, CDFA argues it is speculative whether the program will have to continue after the seven-year period. This argument is disingenuous, given the EIR's statements that an eradication program was chosen specifically to avoid the unending nature of a control program that would have to go on forever. CDFA also argues the exact details of a continued program would be too speculative to study. However, the exact details need not be known with certainty; what matters is what is reasonably foreseeable.
VIII
Summary
DISPOSITIONS
The judgment against the NCRA appellants is reversed and the matter remanded to the superior court with directions to enter a new judgment granting the writ petition. Appellants shall recover costs on appeal. (Cal. Rules of Court, rule 8.278.)
Raye, P. J., and Blease, J., concurred.