Opinion for the Court filed by Circuit Judge RANDOLPH.
RANDOLPH, Circuit Judge:
Utility Solid Waste Activities Group and General Electric petition this court to vacate in part an alteration of the Environmental Protection Agency's rules regulating the use of porous substances contaminated by polychlorinated biphenyls ("PCBs"). PCBs are outstanding insulators and do not burn easily — characteristics that make them useful in transformers, capacitors, and other electrical equipment. PCBs are also carcinogenic and toxic, and may cause immune system suppression, liver damage, endocrine disruption in humans and animals and skin irritation. These dangers are compounded by the remarkable stability of PCB compounds, which bioaccumulate in fatty tissue and are readily absorbed through the skin and respiration, as well as through ingestion of animals exposed to PCBs.
In the 1976 Toxic Substances Control Act ("TSCA"), Congress singled out these chemicals for special treatment. 15 U.S.C. §§ 2601, 2605(e). The Act forbid the "manufacture, processing, distribution in commerce or use" of any PCB except in a "totally enclosed manner." 15 U.S.C. § 2605(e)(2)(A). The EPA Administrator had authority to waive the restriction by rule but only if it would not present an unreasonable risk of injury to health or the environment. 15 U.S.C. § 2605(e)(2)(B). We are told that by January 1, 1978, when these measures took effect, nearly all manufacturing of PCBs had ceased.
In 1987 EPA published a PCB Spill Policy establishing cleanup and decontamination standards for spills of PCBs at concentrations of greater than or equal to ("≥") 50 parts per million ("ppm") that occurred after May 3, 1987. 40 C.F.R. §§ 761.120-761.135.
On June 29, 1998, EPA promulgated major amendments to the PCB regulations ("PCB Mega Rule"). 63 Fed.Reg. 35,384 (1998). This PCB Mega Rule set forth an additional option for spills of ≥ 50 ppm PCBs onto concrete, provided that the concrete could be "decontaminated" by cleaning to 10µg/100 cm
During the development of the PCB Mega Rule, the question whether PCB contaminated surfaces that did not meet the cleanup or decontamination standards could be used was the subject of extensive public comment and inquiry by EPA. See 63 Fed.Reg. at 35,398; Informal Public Hearing Disposal of Polychlorinated Biphenyls (June 6-7, 1995), at 87-88, 100-01; Comments of Chemical Manufacturers Association, USWAG and NEMA on proposed PCB Mega Rule at 26-28; EPA Response to Comments Document at 41 (May 1998). Commenters pointed out that, under EPA's interpretation of the TSCA, buildings with PCB-contaminated porous surfaces (e.g., with concrete or wooden walls or floors) could not be used, even if the risks from exposure were trivial, unless the contaminated surfaces were removed. Id.
Responding to these comments, EPA promulgated 40 C.F.R. § 761.30(p) to authorize the continued use of porous surfaces contaminated by spills of PCBs "regulated for disposal" (i.e., PCBs at concentrations ≥ 50 ppm), provided certain cleaning, painting and marking conditions were met.
The scope of § 761.30(p) established by the PCB Mega Rule was:
40 C.F.R. § 761.30(p) (1998). Under this provision, the requirements in § 761.30(p) — i.e., the cleaning, painting and marking requirements—were triggered when (1) a porous surface was contaminated by a spill of PCBs "regulated for disposal" (i.e., concentrations ≥ 50 ppm PCBs), and (2) the spill resulted in a PCB surface concentration of greater than 10 µg/100 cm
63 Fed.Reg. at 35,398. In other words, surfaces that were contaminated at PCB concentrations ≥ 10 µg/100 cm
On June 24, 1999, without notice and comment, EPA amended the PCB Mega Rule. EPA called the changes minor technical amendments. 64 Fed.Reg. at 33,756. The amendment challenged here repealed the threshold criterion in § 761.30(p)(1) that PCBs had to be present on the porous surface at a surface concentration of ≥ 10 µg/100 cm
40 C.F.R. § 761.30(p)(1) (emphasis added).
The original triggers for § 761.30(p) were a PCB concentration per unit of volume spilled (i.e., ≥ 50 ppm) that resulted in a PCB surface concentration per unit of area (i.e., ≥ 10 µg/100 cm
I.
The Administrative Procedure Act's general rulemaking section, 5 U.S.C. § 553, sets down certain procedural requirements with which agencies must comply in promulgating legislative rules: there must be publication of a notice of proposed rulemaking; opportunity for public comment on the proposal; and publication of a final rule accompanied by a statement of the rule's basis and purpose. See Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 523-24, 98 S.Ct. 1197, 55 L.Ed.2d 460 (1978). That EPA did not comply with the notice and comment requirements of APA § 553 in amending § 761.30(p) is certain. The question is whether EPA's justifications for not doing so will save the amended rule.
A.
EPA represents to us that it altered § 761.30(p) in order to correct language resulting from an erroneous use of the Word Perfect find/replace command in the drafting of the regulation. Declaration of Dr. John H. Smith at 2 (June 23, 2000). We will accept this explanation. The question remains whether EPA needed to comply with the APA in making the correction. EPA thinks not because it possesses "inherent power" to correct "technical errors." It relies on a line of cases beginning with American Trucking Ass'ns v. Frisco Transp. Co., 358 U.S. 133, 79 S.Ct. 170, 3 L.Ed.2d 172 (1958), for the proposition that agencies may correct their mistakes without complying with the APA's procedural requirements. Our court has never recognized such an "inherent power" in the rulemaking context, and we decline to do so now.
The Supreme Court decision just cited dealt with the Interstate Commerce Commission's approval of the acquisition, by a wholly-owned subsidiary of a railroad, of operating rights of several motor carriers. Id. at 135, 79 S.Ct. 170. When the Commission later issued certificates of public convenience and necessity, it failed to include language present in its reports reserving to the Commission the power to
The judicial analogy does not work here. This was not an adjudication. EPA acted in a quasi-legislative fashion. The rule as initially promulgated was legislative in nature. Congress, with some regularity particularly in the tax area, makes technical corrections to legislation, but it does so by enacting corrective legislation, not by issuing an order announcing the change. EPA is not quite so constrained. APA § 553(b)(B) permits it, and other agencies, to dispense with notice and comment "when the agency for good cause finds (and incorporates the finding and a brief statement of reasons therefor in the rules issued) that notice and public procedure thereon are impracticable, unnecessary, or contrary to the public interest." Unlike the Frisco Supreme Court case, the alternative here is not that EPA would be powerless to correct its mistakes. It has the power to do so, so long as it follows certain procedures, either those spelled out in APA § 553(b) for usual notice and comment rulemaking, or in the exception we have just quoted from APA § 553(b)(B).
In Edison Electric Institute v. OSHA, 849 F.2d 611, 622 (D.C.Cir.1988), the government agreed with petitioners that OSHA's failure to include an exception for utilities to a general rule was the result of a ministerial error. Rather than amending the regulation, OSHA achieved the same result by issuing a memorandum instructing those responsible for enforcing the rule to forbear applying it to utilities. Id. The court held that this binding pronouncement interpreting the rule was sufficient to correct the error without an additional round of notice and comment rulemaking. Id.
While Edison Electric is distinguishable, Chlorine Institute, Inc. v. OSHA, 613 F.2d 120, 123 (5th Cir.1980), seems not to be.
B.
In addition to its claim of inherent power to correct mistakes in rules, EPA contends that it brought itself within one or more of the APA's exceptions to notice and comment rulemaking.
APA § 553(b) requires notice of any proposed rule to be published in the Federal Register "unless persons subject thereto are named and either personally served or otherwise have actual notice thereof in accordance with law." 5 U.S.C. § 553(b). EPA's argument is that petitioners received "actual notice" when EPA published the change on its Internet site and when it held a meeting attended by counsel for Utility Solid Waste Activities Group. This court has never found that Internet notice is an acceptable substitute for publication in the Federal Register, and we refuse to do so now. See Appalachian Power Co. v. EPA, 208 F.3d 1015, 1020 (D.C.Cir.2000). In any event, EPA has not even alleged that the petitioners were "named" in the Internet publication, as APA § 553(b) would require if this sort of notice were sufficient. See Rodway v. Department of Agric., 514 F.2d 809, 815 (D.C.Cir.1975). That counsel for one of the petitioners attended a meeting discussing the modification of § 761.30(p) is irrelevant. The other petitioner, General Electric, did not attend. See MCI Telecomm. Corp. v. FCC, 57 F.3d 1136, 1143 (D.C.Cir.1995). EPA thus failed to provide petitioners with "actual notice."
EPA also thinks it qualified for the exception to notice and comment rulemaking contained in APA § 553(b)(B) ("when the agency for good cause finds (and incorporates the finding and a brief statement of reasons therefor in the rules issued) that notice and public procedure thereon are impracticable, unnecessary, or contrary to the public interest"). The claim is that its statement in the Federal Register accompanying the amendment — the amendments contained only "minor, routine clarifications that will not have a significant effect on industry or the public" — amounted to a finding of good cause and a statement of reasons. There are three grounds in APA § 553(b)(B) for finding good cause: notice and comment would be "impracticable, unnecessary, or contrary to the public interest." EPA does not tell us which of the three it meant to invoke, so we will discuss each. In doing so we are mindful of our precedents that the "good cause" exception is to be "narrowly construed and only reluctantly countenanced." Tennessee Gas Pipeline Co. v. FERC, 969 F.2d 1141, 1144 (D.C.Cir.1992) (quoting New Jersey v. EPA, 626 F.2d 1038, 1045 (D.C.Cir.1980)). The exception is not an "escape clause"; its use "should be limited to emergency situations." American Fed'n of Gov't Employees v. Block, 655 F.2d 1153, 1156 (D.C.Cir.1981).
With respect to "impracticable" ground, the Attorney General's Manual explains "that a situation is `impracticable' when an agency finds that due and timely execution of its functions would be impeded by the notice otherwise required in [§ 553]," as when a safety investigation shows that a new safety rule must be put in place immediately. UNITED STATES DEPARTMENT
With respect to the "unnecessary" prong of the exception, one court has ruled that its use is "confined to those situations in which the administrative rule is a routine determination, insignificant in nature and impact, and inconsequential to the industry and to the public." South Carolina v. Block, 558 F.Supp. 1004, 1016 (D.S.C. 1983) (internal quotations omitted); see also Texaco, Inc. v. FPC, 412 F.2d 740, 743 (3d Cir.1969). This formulation comports with the explanation in the Attorney General's Manual that "`[u]nnecessary' refers to the issuance of a minor rule in which the public is not particularly interested." ATTORNEY GENERAL'S MANUAL at 31. EPA's amendment of 40 C.F.R. § 761.30(p) does not fit that mold. As amended, the rule greatly expanded the regulated community and increased the regulatory burden. In the original rule, porous surfaces contaminated by spills containing ≥ 50 ppm PCBs were not regulated by § 761.30(p) if the resulting PCB surface contamination was less than 10 µg/100 cm
As to the "public interest" ground for finding good cause, the Attorney General's Manual states that this "connotes a situation in which the interest of the public would be defeated by any requirement of advance notice," as when announcement of a proposed rule would enable the sort of financial manipulation the rule sought to prevent. ATTORNEY GENERAL'S MANUAL at 31; see also Riverbend Farms, Inc. v. Madigan, 958 F.2d 1479, 1484 n. 2 (9th Cir.1992); Levesque v. Block, 723 F.2d 175, 184-85 (1st Cir.1983). Nothing of the sort is present here and nothing EPA said in promulgating the amendment suggested that it needed to forego notice and comment in order to prevent the amended rule from being evaded.
We therefore hold that EPA cannot take advantage of the exceptions contained in APA § 553(b)(B).
We hold as well that EPA cannot be excused from compliance with § 553 on the basis that its failure to engage in notice and comment rulemaking amounted to harmless error. This seems to us merely another way of saying that the change in the rule was unimportant, having no significant impact. We have already rejected that position. If EPA means instead that its error in not conducting notice and comment rulemaking prejudiced no one, we disagree. Petitioners have presented enough to show that on remand they can mount a credible challenge to the amended rule and were thus prejudiced by the absence of an opportunity to do so before the amendment.
The amendment to 40 C.F.R. § 761.30(p), as set forth in the June 1999 Federal Register, constituted agency action "without observance of [the] procedure required by law" and, as such, it is "unlawful and set aside." 5 U.S.C. § 706(2)(D).
Accordingly, the petitions for judicial review are granted.