Ordered that the order is affirmed, with one bill of costs.
Under CPLR 214-c (2), the time for bringing this action to recover damages resulting from exposure to a harmful substance began to run when the plaintiff discovered corrosion in the metal of its boiler system, and not when the connection between that corrosion and the exposure of the boiler system to a harmful substance was recognized (see, Matter of New York County DES Litig. [Wetherill v Eli Lilly &...