The plaintiff brings this breach of contract action claiming that a building constructed for him by the defendant was defective in a number of ways. The trial court found that a number of defects were proven, including an unlevel concrete slab and improperly installed insulation.
Although the plaintiff introduced no evidence to show how much the various defects would cost to repair, the trial judge...