MEMORANDUM OF DECISION ON PLAINTIFFS' MOTION TO EXTEND INJUNCTION
NEWMAN, District Judge.
This second phase of the Route 7 litigation in Connecticut requires decision as to whether a proposed highway from Danbury to New Milford is a "Federal
An incorporated and renamed association of area residents, which is successor in interest to one of the original plaintiffs, has now moved to extend the scope of the original injunction to bar construction between Danbury and New Milford until adequate compliance with NEPA. The motion was precipitated by the state defendants advertisement of bids for construction of projects 34-124 and 18-95 in the Towns of Danbury and Brookfield. These projects are to be part of relocated Route 7 north of Danbury. Plaintiffs urge that the portion of relocated Route 7 from Danbury to New Milford is a "Federal action" within the meaning of NEPA because of (a) federal funds already spent, (b) the State's eligibility for future federal funding, and (c) the relationship between the portion of relocated Route 7 north of Danbury and the portion south of Danbury, which all concede is a "Federal action."
I.
Federal Funding
The principal federal funds relied on by plaintiff are those that have been used to construct a portion of I-84 in Danbury and a spur that connects I-84 to Route 7 north of Danbury. I-84 is a
The overlap of the two route designations does not mean that Route 7 north of Danbury is a federal highway for NEPA purposes. Congress has not purported to apply NEPA requirements to very highway that connects with a federally-funded highway, and the fact that the connection here involves a three-mile overlap makes no difference.
Plaintiffs direct more serious attention to the spur north of I-84, since this spur will be the southern terminus of the new Route 7 north of Danbury. Plaintiffs cite particularly $465,000 of "Federal-aid primary" money, 23 U.S.C. § 103(b), used to build a bridge at the northerly end of the spur. The spur is currently connected by two temporary ramps to the presently existing Route 7. State plans call for the removal of these ramps once the new Route 7 has been built from the spur northward. Once that occurs, cars travelling north from Danbury on new Route 7 will cross the federally-funded bridge and remain on the state-funded portion of new Route 7 for about one mile until the first exit is reached. Similarly cars coming south toward Danbury on new Route 7, after passing an exit one mile north of the bridge, will have to cross the bridge and continue on into I-84. Plaintiffs' contention is that the portion of Route 7 that the state proposes to build north of Danbury does not merely intersect with a federally-funded highway, it becomes a federal highway because its southern end (the spur north of Danbury) is a federally-funded road.
Whether a state-funded road is nonetheless a federal road for NEPA purposes when it is merely one segment of a federal highway is an issue to be considered subsequently in this opinion. But no matter how strict an approach one takes to "segmenting," cf. Named Individual Members of San Antonio Conservation Society v. Texas Highway Department, 446 F.2d 1013 (5th Cir. 1971) (hereafter "San Antonio"), it is simply unrealistic to consider the 14.4-mile span from Danbury to New Milford to be a "segment" improperly broken off from the federally-funded spur of less than one-quarter of a mile.
Nor does it matter that the spur and the 14-mile span become a unit from which there is no exit along the southernmost mile. Most roads link up with other roads. When I-84 was constructed through Danbury, it was obviously necessary to construct a means of connecting that highway with existing Route 7. That is what the spur and the temporary ramps accomplish. They have a use entirely independent of any future use they might serve as the southern end of new Route 7 above Danbury. Once the state builds the new Route 7 above Danbury, it is entitled to link up with the connection between I-84 and old Route 7, and neither this connection nor the elimination of the ramps to the replaced road federalizes the new state-funded road.
The only other federal funding indicated is a sum less than $50,000 of federal highway planning and research funds that were used in connection with the planning of the proposed road. The size of this expenditure and the totally preliminary purposes of the funds are too insignificant to render the proposed multi-million dollar highway a federal
II.
Eligibility for Federal Funding
More substantial is plaintiffs' claim that NEPA compliance is required because the portion of new Route 7 between Danbury and New Milford has been eligible for federal funding. State officials agree with plaintiffs that the conduct of corridor and design hearings were carried out pursuant to state requirements that are intended to be as rigorous as federal requirements. The purpose, explicitly acknowledged in the testimony of the state's deputy commissioner of transportation, is to preserve eligibility for federal funding, if anticipated state funds do not materialize.
Plaintiffs' contention that eligibility for federal funding requires NEPA compliance draws support from three decisions, La Raza Unida v. Volpe, 337 F.Supp. 221 (N.D.Cal.1971); Sierra Club v. Volpe, 351 F.Supp. 1002 (N.D.Cal. 1972), and James River, supra. La Raza Unida ruled that a highway becomes subject to "various federal statutes and regulations" at the point when location approval has been given by the Federal Highway Administration, see Policy and Procedures Memorandum (PPM) 20-8, whether or not the state has received or even sought any federal funds. While NEPA compliance was not explicitly adjudicated, 337 F.Supp. at 234, n. 8, the opinion emphasizes the importance of the environmental policies protected by NEPA and also by 23 U.S. C. § 138.
The two subsequent cases have cited La Raza Unida approvingly, although they had no occasion to apply its holding. Sierra Club v. Volpe, supra, is really a segmenting case, the court concluding that a 6.3-mile portion of highway connecting long portions of federally-funded highways on either side could not be isolated from compliance with NEPA. The court also relied upon the state's disavowal of expected federal funding after the litigation had started. James River held that the challenged highway was not a federal highway, in part because there had been no federal location approval. Nevertheless the court explicitly endorsed La Raza Unida, warning that if a state could avoid NEPA compliance by foregoing federal funds though eligible for them after location approval, a state could ignore environmental considerations in precisely those instances where they may be most important. 359 F.Supp. at 633.
Both the state and federal defendants here seek to avoid the import of La Raza
The state defendants minimize the significance of this route revision approval. They contend that federal review of a proposed change in a federal-aid primary route "is only to determine if the highway system will retain its coordinated nature." However, Angelo Siccardi, the FHWA's division engineer, testified that the route revision approval is not only sufficient to constitute location approval within the meaning of PPM 20-8, but in fact the submission required to obtain route revision approval is more detailed than that required to obtain location approval. Moreover, both the federal and state defendants agree that projects on the Danbury-New Milford span not yet advertised for bid remain eligible for federal funding. That could be so only if the design public hearing that was held in conformity with federal requirements was preceded by location approval. See PPM 20-8(4)(b)(1).
Arguably a difference between "route revision" approval and location approval can be found in the likely attitude of state officials at the time each is sought. Application for "route revision" approval simply implies that the state wants to insure its eligibility for federal funding. By seeking location approval, however, the state manifests at least a tentative decision to seek federal funding. However, neither step commits the state to build the highway at all, nor to use federal funds if the highway is built, and surely neither step commits the federal agency to supply federal funds. Moreover, determination of whether the federal government is sufficiently involved in a highway to make it a "Federal action" within the meaning of NEPA should not depend on the state of mind of a potential state applicant for funds.
Thus the issue must be faced as to whether NEPA compliance is required for a span of a relocated highway that has received FHWA approval to remain on the federal-aid primary system when state highway officials have taken all steps necessary to remain eligible for federal funding but have elected to use only state funds for construction. Though recognizing the force of the argument developed in La Raza Unida, this Court concludes that while Congress no doubt has power to require NEPA compliance in such circumstances, the existing legislation simply does not do so.
The argument in La Raza Unida, as echoed in James River, is that if NEPA does not apply to highways that are eligible for federal funding, state officials will retain the discretion to decide at any time prior to construction whether to subject themselves to NEPA requirements. Since they need not elect to take federal funds until the end of the planning and design process, they can retain the option of foregoing federal funds if NEPA compliance appears onerous. Moreover, they do not lose federal money, since these funds are invariably reallocated to other federal-aid highways within the state.
The contentions are all sound, but with deference I do not understand how they establish that such an option on the part of a state constitutes the highway a "Federal action" within the meaning of NEPA. Solicitude for the environment cannot substitute for legislation. Congress has not applied NEPA to all highways that the states are eligible to fund with federal dollars. There is no indication in this case that the FHWA has in any way induced Connecticut to reconstruct Route 7 between
The State's option to use federal dollars, though open virtually until the concrete is poured, is nonetheless an option, and the State's choice should not be restricted simply because one alternative of the option (using state dollars) might result in less adequate assessment of environmental considerations. If the highway is not a federal action, then a state's decision to avoid federal involvement cannot have the paradoxical effect of establishing federal involvement. Cases may arise where a state has developed such a partnership with the federal government in the joint decision-making as to whether and where to build a highway that a last-minute state election to use state money for construction cannot be permitted to erase the federal imprimatur already placed on the project. See San Antonio, supra, 446 F.2d at 1027. But that has not occurred here. "Route revision" approval plus continued conformity by state highway officials with federal requirements to preserve eligibility for federal funding is not sufficient to constitute a state-funded highway as a "Federal action" within the meaning of NEPA.
III.
Segmenting
Though not a "Federal action" in and of itself, the Danbury-New Milford portion of new Route 7 would be subject to NEPA requirements if it were an integral part of a "Federal action" to build a highway from Norwalk to New Milford. Plaintiffs insist this is precisely the case.
There is no doubt that the state plans to build a four-lane limited access expressway from Norwalk to New Milford. The Connecticut General Assembly authorized the planning for such a highway in 1957 and has since authorized what highway officials hope will be sufficient bonding authority. From the state's perspective it is one highway. But the state's intention, though relevant, does not determine federal consequences. The issue is whether the portion of new Route 7 between Danbury and New Milford has independent justification or whether construction of this span is dependent upon construction of the entire highway. See San Antonio, supra; Arlington Coalition v. Volpe, 458 F.2d 1323 (4th Cir. 1972); Sierra Club v. Volpe, supra; James River, supra.
Plaintiffs rely essentially on the many documents whereby the state highway officials expressed their intention to build a highway from Norwalk to New Milford. The state defendants rely on evidence that most of the traffic on the Danbury-New Milford portion will originate and terminate in these or intermediate towns. The federal defendants, though explicitly invited to express a view with respect to the administration of important federal statutes, have said only that this is a matter for the Court's decision.
There seems little doubt that until the enactment of NEPA and particularly the injunction issued in this litigation, the state highway officials made no particular distinction between new Route 7 south and north of Danbury. To the extent the highway was thought of in two parts, the dividing line was a point near Silvermine Road in Brookfield, north of Danbury. This apparently stemmed from the fact that the state legislature authorized bonding in two stages and the first stage reached from Norwalk only to this point in Brookfield. See Conn.Gen.Stat. § 13a-185(b)(6).
Nevertheless, the demographic and traffic aspects provide sufficient independent justification for the Danbury-New Milford portion. The populations
It is true, as plaintiffs contend, that construction of the portion north of Danbury will provide additional reason for construction of the portion south of Danbury. But as long as the northern portion has sufficient independent justification, it cannot be considered an indivisible part of a single highway, simply because its existence increases the likelihood of building the southern portion Again, this factor may be relevant, but it is not decisive. Construction of the Danbury-New Milford portion without NEPA compliance is not an impermissible segmenting of the Norwalk-New Milford reconstruction of Route 7.
Though not specifically urged by plaintiffs, it might be appropriate in some cases to reach a conclusion of "Federal action" based on the cumulative effect of the various factors considered in this opinion. The federal dollars to build the spur that will connect new Route 7 to I-84 and the small amount of highway planning and research funds, the "route revision" approval by the FHWA and the state's continued eligibility for federal funding for later projects north of Danbury, and the relationship between the Danbury-New Milford portion and the Norwalk-Danbury portion may well be considered to have a greater total effect than any factor alone. The case law in this developing field has not identified with clarity the standard against which such a combination of factors is to be measured. Though the question on these facts is close, it does not appear that the federal government has played a sufficient role in the reconstruction of highway between Danbury and New Milford to make this portion of Route 7 a "Federal action" within the meaning of NEPA. The preparation of an overall EIS for "the entire Route 7 corridor" has already been ordered. Conservation Society of Southern Vermont, Inc. v. Secretary of Transportation, 362 F.Supp. 627, 638 (D.Vt.1973). Since the Danbury-New Milford portion is deemed not to be a "Federal action," an EIS for this specific portion need not be prepared prior to construction of the projects challenged by this motion to extend the prior injunction. Accordingly, that motion is denied.
FootNotes
In retrospect, it appears that two distinct issues were not adequately separated. The first is whether the EIS required before construction of Route 7 between Norwalk and Danbury need cover only that span or must also cover the entire span from Norwalk to New Milford. The second is whether there can be construction between Danbury and New Milford without preparation of an EIS for this span. Though the two questions are somewhat related, their resolution does not turn on identical factors. The first issue will come before this Court when defendants seek to vacate the present injunction on the ground that an adequate EIS has been prepared. The second issue is squarely raised by the present controversy between the parties and requires adjudication now.
All parties appear to have assumed, correctly, that the original injunction, as clarified (?) by the subsequent Ruling on Motions to Amend Judgment, barred construction of relocated Route 7 between Norwalk and Danbury and did not resolve the issue now pending concerning construction between Danbury and New Milford.